United States › Grid › Interconnection queues › Massachusetts

SOLAR + STORAGE · ISO-NE

EE 2024 SEMA/Cape ASO Group Study

EE 2024 SEMA/Cape ASO Group Study is a 2.5 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Barnstable County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2024 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1527
Grid region
ISO-NE (New England)
Connection point (POI)
EE STA_933 Falmouth
Location
Barnstable County, Massachusetts
Technology
Solar: 2.5 MW · Battery
Total requested
2.5 MW
Queue status
Withdrawn
Entered queue
8 May 2024
Proposed online date
December 2026
Withdrawn
June 2025

Location

Marker shows the centre of Barnstable County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Barnstable County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem