United States › Grid › Interconnection queues › Massachusetts

SOLAR + STORAGE · ISO-NE

Solar + Battery Storage

Solar + Battery Storage is a 2.4 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Bristol County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedMar 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1023
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource 13.2 kV Circuit #522 approximately 5.95 miles from Fisher Road substation
Location
Bristol County, Massachusetts
Technology
Solar: 2.4 MW · Battery
Total requested
2.4 MW
Service type
Network resource (NRIS)
Study phase
Not Started
Queue status
Withdrawn
Entered queue
24 April 2020
Proposed online date
October 2021
Withdrawn
March 2022

Location

Marker shows the centre of Bristol County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Bristol County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem