United States βΊ Grid βΊ Interconnection queues βΊ Rhode Island
SOLAR Β· ISO-NEPutnam Pike - NG WRI DG Area Study #2 <5 MW
Putnam Pike - NG WRI DG Area Study #2 <5 MW is a 3.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Providence County, Rhode Island.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2020 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1050
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- NG Putnam Pike substation, feeder 38F3
- Location
- Providence County, Rhode Island
- Technology
- Solar: 3.0 MW
- Total requested
- 3.0 MW
- Queue status
- Withdrawn
- Entered queue
- 19 August 2020
- Proposed online date
- August 2021
- Withdrawn
- June 2025
Location
Marker shows the centre of Providence County; the queue data does not give exact sites.
Power plants in Rhode Island Β· Transmission lines in Rhode Island
Other requests in Providence County
- Ocean State Power uprateGas Β· 73.2 MW Β· agreement signed
- Manchester Street Station increaseGas Β· 492 MW Β· built
- RISEP IncreaseGas Β· 66.0 MW Β· built
- GD 1-9 Iron Mine SolarSolar Β· 38.4 MW Β· built
- Rhode Island Landfill Gas GencoOther Β· 27.9 MW Β· built
- Johnston Landfill WindOnshore wind Β· 21.0 MW Β· built
- SolarSolar Β· 16.3 MW Β· built
- Manchester Street Station Exciter Upgrades & increGas Β· 12.0 MW Β· built
- SolarSolar Β· 10.0 MW Β· built
- Ridgewood RI Generation Phase IOther Β· 4.2 MW Β· built
- Clear RiverGas Β· 1,030 MW Β· withdrawn
- Exciter UpgradesGas Β· 492 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem