Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown982118.1 GW
Active in queue14.6 GW72 requests
Agreement signed8,609 MW45 requests
Withdrawn982118.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

982 requests · page 16 of 20
ProjectCapacityStatusLocationRegionQueuedOnline
Solar
Solar
8.1 MWWithdrawn / abandoned Windham, VTISO-NE Jun 2024target 2026
Solar
Solar
8.1 MWWithdrawn / abandoned Worcester, MAISO-NE Nov 2018target 2020
E. Westminster Substation - NG Western MA Area Cluster Study
Solar
8.0 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2018target 2022
Farnum Pike - NG WRI DG Area Study #2 >5 MW
Solar
8.0 MWWithdrawn / abandoned Providence, RIISO-NE Aug 2020target 2022
Eversource Group @ Falmouth 993
Solar + storage
8.0 MWWithdrawn / abandoned Barnstable, MAISO-NE Apr 2020target 2023
CHP
Gas
8.0 MWWithdrawn / abandoned Coos, NHISO-NE Apr 2017target 2018
Solar
Solar
8.0 MWWithdrawn / abandoned Washington, RIISO-NE Aug 2018target 2021
EE Valley DG Group Study
Solar
8.0 MWWithdrawn / abandoned Plymouth, MAISO-NE Nov 2023target 2026
Fuel Cell
Gas
8.0 MWWithdrawn / abandoned Fairfield, CTISO-NE May 2006target 2007
Crystal Lake Substation - NG WMA Group 3
Battery storage
8.0 MWWithdrawn / abandoned Worcester, MAISO-NE Oct 2021target 2026
Kimball DG Area Study
Solar + storage
7.9 MWWithdrawn / abandoned York, MEISO-NE May 2022target 2028
Combined Reciprocating, Solar and Battery modification
Solar + storage
7.8 MWWithdrawn / abandoned Middlesex, MAISO-NE Sep 2018target 2022
CMP County Road 115 kV SS - Winslow-Lakewood Areas Study
Solar + storage
7.8 MWWithdrawn / abandoned Kennebec, MEISO-NE Feb 2021target 2024
Wood River Substation - NG Western RI DG Area Study
Solar
7.8 MWWithdrawn / abandoned Washington, RIISO-NE Mar 2020target 2021
Group @ Berkshire 18C
Solar + storage
7.7 MWWithdrawn / abandoned Hampden, MAISO-NE Jan 2022target 2023
Group @ Podick - WMA ASO
Solar + storage
7.7 MWWithdrawn / abandoned Hampden, MAISO-NE Jan 2022target 2023
Biomass
Other
7.6 MWWithdrawn / abandoned Cumberland, MEISO-NE Jun 2009target 2010
Wind
Onshore wind
7.5 MWWithdrawn / abandoned Berkshire, MAISO-NE Jun 2018target 2020
Eversource Group @ Crystal Spring 646
Solar + storage
7.5 MWWithdrawn / abandoned Middlesex, MAISO-NE Apr 2020target 2023
Solar
Solar
7.5 MWWithdrawn / abandoned Windham, CTISO-NE Feb 2018target 2019
Solar and Battery
Solar + storage
7.5 MWWithdrawn / abandoned Androscoggin, MEISO-NE Aug 2019target 2020
Chase Hill - NG WRI DG Area Study #2 <5 MW
Solar
7.3 MWWithdrawn / abandoned Washington, RIISO-NE Aug 2020target 2025
Solar
Solar
7.0 MWWithdrawn / abandoned Washington, RIISO-NE Nov 2017target 2020
Eversource Group @ Arsene St 654
Solar + storage
7.0 MWWithdrawn / abandoned Bristol, MAISO-NE Apr 2020target 2023
Group @ Blandford 19J - WMA ASO
Solar + storage
7.0 MWWithdrawn / abandoned Berkshire, MAISO-NE Jan 2022target 2023
Group @ West Pond 737 - EMA ASO
Solar + storage
7.0 MWWithdrawn / abandoned Middlesex, MAISO-NE Jun 2022target 2025
EE Group @ Southwick
Solar + storage
7.0 MWWithdrawn / abandoned Hampden, MAISO-NE Jun 2023target 2024
Uxbridge Substation – NG Hopedale West Group Study
Battery storage
7.0 MWWithdrawn / abandoned Worcester, MAISO-NE Sep 2022target 2025
Battery Storage
Battery storage
7.0 MWWithdrawn / abandoned Hartford, CTISO-NE Aug 2023target 2024
Warren Substation – NG RI-Warren-20-Comp-1 Study
Solar
6.9 MWWithdrawn / abandoned Kent, RIISO-NE Aug 2020target 2024
Tower Hill - NG Western RI DG Area Study
Solar
6.8 MWWithdrawn / abandoned Washington, RIISO-NE Mar 2020target 2023
Group @ Duxbury 738 - EMA ASO
Solar + storage
6.8 MWWithdrawn / abandoned Plymouth, MAISO-NE Jun 2022target 2023
Wood River - NG Western RI DG Area Study
Solar
6.5 MWWithdrawn / abandoned Washington, RIISO-NE Mar 2020target 2022
Solar
Solar
6.3 MWWithdrawn / abandoned Providence, RIISO-NE Jan 2019target 2023
Landfill Gas
Other
6.3 MWWithdrawn / abandoned Coos, NHISO-NE Mar 2007target 2008
CHP
Gas
6.3 MWWithdrawn / abandoned Newport, RIISO-NE Sep 2018target 2021
Chase Hill Substation - NG Western RI DG Area Study
Solar
6.3 MWWithdrawn / abandoned Washington, RIISO-NE Mar 2020target 2021
Solar
Solar
6.2 MWWithdrawn / abandoned Providence, RIISO-NE Mar 2019target 2025
Solar
Solar
6.2 MWWithdrawn / abandoned Providence, RIISO-NE Mar 2019target 2025
Solar
Solar
6.1 MWWithdrawn / abandoned Washington, RIISO-NE Nov 2017target 2020
East Haven Wind Farm
Onshore wind
6.0 MWWithdrawn / abandoned Essex, VTISO-NE Nov 2003target 2012
Solar
Solar
6.0 MWWithdrawn / abandoned New London, CTISO-NE Feb 2018target 2019
Rhode Island Landfill Gas Genco Increase (see QP #
Other
6.0 MWWithdrawn / abandoned Providence, RIISO-NE May 2008target 2013
Little Rest Rd Substation - NG Western MA Area Cluster Study
Solar
6.0 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2018target 2022
Solar
Solar
6.0 MWWithdrawn / abandoned Tolland, CTISO-NE Jun 2020target 2024
Solar
Solar
6.0 MWWithdrawn / abandoned Bristol, MAISO-NE Mar 2011target 2012
Little Rest Rd Substation - NG WMA Group 3
Solar + storage
5.8 MWWithdrawn / abandoned Worcester, MAISO-NE Oct 2021target 2027
Putnam Pike Substation - NG Western RI DG Area Study
Solar
5.6 MWWithdrawn / abandoned Providence, RIISO-NE Mar 2020target 2021
Fuel Cell
Gas
5.6 MWWithdrawn / abandoned New London, CTISO-NE Mar 2014target 2018
Solar + battery
Solar + storage
5.5 MWWithdrawn / abandoned Middlesex, MAISO-NE Apr 2020target 2025
Page 16 of 20

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)