| Project | Capacity | Status |
|---|---|---|
| Solar Solar |
8.1 MW | Withdrawn / abandoned |
| Solar Solar |
8.1 MW | Withdrawn / abandoned |
| E. Westminster Substation - NG Western MA Area Cluster Study Solar |
8.0 MW | Withdrawn / abandoned |
| Farnum Pike - NG WRI DG Area Study #2 >5 MW Solar |
8.0 MW | Withdrawn / abandoned |
| Eversource Group @ Falmouth 993 Solar + storage |
8.0 MW | Withdrawn / abandoned |
| CHP Gas |
8.0 MW | Withdrawn / abandoned |
| Solar Solar |
8.0 MW | Withdrawn / abandoned |
| EE Valley DG Group Study Solar |
8.0 MW | Withdrawn / abandoned |
| Fuel Cell Gas |
8.0 MW | Withdrawn / abandoned |
| Crystal Lake Substation - NG WMA Group 3 Battery storage |
8.0 MW | Withdrawn / abandoned |
| Kimball DG Area Study Solar + storage |
7.9 MW | Withdrawn / abandoned |
| Combined Reciprocating, Solar and Battery modification Solar + storage |
7.8 MW | Withdrawn / abandoned |
| CMP County Road 115 kV SS - Winslow-Lakewood Areas Study Solar + storage |
7.8 MW | Withdrawn / abandoned |
| Wood River Substation - NG Western RI DG Area Study Solar |
7.8 MW | Withdrawn / abandoned |
| Group @ Berkshire 18C Solar + storage |
7.7 MW | Withdrawn / abandoned |
| Group @ Podick - WMA ASO Solar + storage |
7.7 MW | Withdrawn / abandoned |
| Biomass Other |
7.6 MW | Withdrawn / abandoned |
| Wind Onshore wind |
7.5 MW | Withdrawn / abandoned |
| Eversource Group @ Crystal Spring 646 Solar + storage |
7.5 MW | Withdrawn / abandoned |
| Solar Solar |
7.5 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
7.5 MW | Withdrawn / abandoned |
| Chase Hill - NG WRI DG Area Study #2 <5 MW Solar |
7.3 MW | Withdrawn / abandoned |
| Solar Solar |
7.0 MW | Withdrawn / abandoned |
| Eversource Group @ Arsene St 654 Solar + storage |
7.0 MW | Withdrawn / abandoned |
| Group @ Blandford 19J - WMA ASO Solar + storage |
7.0 MW | Withdrawn / abandoned |
| Group @ West Pond 737 - EMA ASO Solar + storage |
7.0 MW | Withdrawn / abandoned |
| EE Group @ Southwick Solar + storage |
7.0 MW | Withdrawn / abandoned |
| Uxbridge Substation – NG Hopedale West Group Study Battery storage |
7.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
7.0 MW | Withdrawn / abandoned |
| Warren Substation – NG RI-Warren-20-Comp-1 Study Solar |
6.9 MW | Withdrawn / abandoned |
| Tower Hill - NG Western RI DG Area Study Solar |
6.8 MW | Withdrawn / abandoned |
| Group @ Duxbury 738 - EMA ASO Solar + storage |
6.8 MW | Withdrawn / abandoned |
| Wood River - NG Western RI DG Area Study Solar |
6.5 MW | Withdrawn / abandoned |
| Solar Solar |
6.3 MW | Withdrawn / abandoned |
| Landfill Gas Other |
6.3 MW | Withdrawn / abandoned |
| CHP Gas |
6.3 MW | Withdrawn / abandoned |
| Chase Hill Substation - NG Western RI DG Area Study Solar |
6.3 MW | Withdrawn / abandoned |
| Solar Solar |
6.2 MW | Withdrawn / abandoned |
| Solar Solar |
6.2 MW | Withdrawn / abandoned |
| Solar Solar |
6.1 MW | Withdrawn / abandoned |
| East Haven Wind Farm Onshore wind |
6.0 MW | Withdrawn / abandoned |
| Solar Solar |
6.0 MW | Withdrawn / abandoned |
| Rhode Island Landfill Gas Genco Increase (see QP # Other |
6.0 MW | Withdrawn / abandoned |
| Little Rest Rd Substation - NG Western MA Area Cluster Study Solar |
6.0 MW | Withdrawn / abandoned |
| Solar Solar |
6.0 MW | Withdrawn / abandoned |
| Solar Solar |
6.0 MW | Withdrawn / abandoned |
| Little Rest Rd Substation - NG WMA Group 3 Solar + storage |
5.8 MW | Withdrawn / abandoned |
| Putnam Pike Substation - NG Western RI DG Area Study Solar |
5.6 MW | Withdrawn / abandoned |
| Fuel Cell Gas |
5.6 MW | Withdrawn / abandoned |
| Solar + battery Solar + storage |
5.5 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)