United States βΊ Grid βΊ Interconnection queues βΊ Massachusetts
SOLAR Β· ISO-NESolar
Solar is a 6.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Bristol County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2011 (completed)
- Withdrawn / abandonedJul 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 363
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- NSTAR 115 kV or 13.2 kV
- Location
- Bristol County, Massachusetts
- Technology
- Solar: 6.0 MW
- Total requested
- 6.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 31 March 2011
- Proposed online date
- December 2012
- Withdrawn
- July 2011
Location
Marker shows the centre of Bristol County; the queue data does not give exact sites.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Other requests in Bristol County
- Battery StorageBattery storage Β· 350 MW Β· in study
- Battery StorageBattery storage Β· 168 MW Β· in study
- Brayton Point 3 Uprate( see 243)Coal Β· 30.0 MW Β· built
- Dartmouth Power ExpansionGas Β· 24.0 MW Β· built
- Increase to Steam Turbine Capacity Uprate (See QPCoal Β· 6.0 MW Β· built
- Dighton Power UprateGas Β· 5.0 MW Β· built
- SolarSolar Β· 1.9 MW Β· built
- Combined CycleGas Β· 550 MW Β· withdrawn
- Battery StorageBattery storage Β· 529 MW Β· withdrawn
- Battery StorageBattery storage Β· 293 MW Β· withdrawn
- Battery StorageBattery storage Β· 271 MW Β· withdrawn
- Battery StorageBattery storage Β· 257 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem