United States › Grid › Interconnection queues › Massachusetts
BATTERY STORAGE · ISO-NECrystal Lake Substation - NG WMA Group 3
Crystal Lake Substation - NG WMA Group 3 is a 8.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Worcester County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2021 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1174
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- NG Crystal Lake Substation
- Location
- Worcester County, Massachusetts
- Technology
- Battery: 8.0 MW
- Total requested
- 8.0 MW
- Queue status
- Withdrawn
- Entered queue
- 27 October 2021
- Proposed online date
- December 2026
- Withdrawn
- June 2025
Location
Marker shows the centre of Worcester County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Worcester County
- Battery StorageBattery storage · 204 MW · agreement signed
- Battery StorageBattery storage · 300 MW · in study
- Battery StorageBattery storage · 180 MW · in study
- Combined Cycle Uprate #2Gas · 30.0 MW · built
- Crystal Lake Substation - NG Western MA Area Cluster StudySolar · 24.7 MW · built
- Solar with BatterySolar + storage · 10.0 MW · built
- Harrington Street PV Project (QF)Solar · 9.8 MW · built
- Litchfield substation - NG Western MA Area Cluster StudySolar · 9.5 MW · built
- N. Oxford Substation - NG Western MA Area Cluster StudySolar · 8.7 MW · built
- SolarSolar · 8.0 MW · built
- Fitchburg Renewable EnergyOther · 7.2 MW · built
- SolarSolar · 6.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem