United States › Grid › Interconnection queues › Massachusetts

SOLAR + STORAGE · ISO-NE

Combined Reciprocating, Solar and Battery modification

Combined Reciprocating, Solar and Battery modification is a 7.8 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Middlesex County, Massachusetts, connecting to NGRID.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2018 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
780
Grid region
ISO-NE (New England)
Utility / transmission owner
NGRID
Connection point (POI)
GRID Hendersonville 593 substation (593W1 and 593W4)
Location
Middlesex County, Massachusetts
Technology
Solar: 7.8 MW · Gas · Battery
Total requested
7.8 MW
Queue status
Withdrawn
Entered queue
11 September 2018
Proposed online date
May 2022
Withdrawn
June 2025

Location

Marker shows the centre of Middlesex County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Middlesex County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem