GAS Β· ISO-NEBillerica Power
Billerica Power is a 311 MW gas request withdrawn in the ISO-NE interconnection queue, in Middlesex County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2006 (completed)
- Withdrawn / abandonedDec 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 157
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- J-162 line to Tewksbury Substation
- Location
- Middlesex County, Massachusetts
- Technology
- Gas: 311 MW Β· Oil
- Total requested
- 311 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 21 June 2006
- Proposed online date
- June 2011
- Withdrawn
- December 2009
Location
Marker shows the centre of Middlesex County; the queue data does not give exact sites.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Other requests in Middlesex County
- Battery StorageBattery storage Β· 508 MW Β· agreement signed
- Norman Street Battery StorageBattery storage Β· 204 MW Β· agreement signed
- Battery StorageBattery storage Β· 500 MW Β· in study
- Battery StorageBattery storage Β· 125 MW Β· in study
- Kendall Revised Reconfiguration ProjectGas Β· 250 MW Β· built
- L'EnergiaGas Β· 74.0 MW Β· built
- Cogen DGGas Β· 43.0 MW Β· built
- Combined Reciprocating, Solar and BatterySolar + storage Β· 7.8 MW Β· built
- Kendall #3 Back Pressure Steam TurbineGas Β· 7.5 MW Β· built
- Kendall Reconfiguration ProjectGas Β· 1.9 MW Β· built
- Battery StorageBattery storage Β· 500 MW Β· withdrawn
- Gas TurbineGas Β· 208 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem