United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
SOLAR Β· ISO-NESolar
Solar is a 6.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Tolland County, Connecticut, connecting to NU.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1033
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NU
- Connection point (POI)
- Eversource Scitico #27H9
- Location
- Tolland County, Connecticut
- Technology
- Solar: 6.0 MW
- Total requested
- 6.0 MW
- Queue status
- Withdrawn
- Entered queue
- 24 June 2020
- Proposed online date
- September 2024
- Withdrawn
- June 2025
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in Tolland County
- UCONN COGEN FacilityGas Β· 24.9 MW Β· built
- EE Mansfield Center DG ClusterSolar Β· 20.0 MW Β· withdrawn
- EE Mansfield Center DG ClusterSolar + storage Β· 10.8 MW Β· withdrawn
- CT additionalGas Β· 10.0 MW Β· withdrawn
- Community Power Group, 24 Middle Road, Ellington, CTSolar Β· 4.0 MW Β· withdrawn
- USS Vineyard Solar, Somers RdSolar Β· 4.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem