United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
GAS Β· ISO-NECT additional
CT additional is a 10.0 MW gas request withdrawn in the ISO-NE interconnection queue, in Tolland County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2019 (completed)
- Withdrawn / abandonedAug 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 895
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Connecticut Light and Power Company d/b/a Eversource Connecticut (ES CT) Card-Mansfield 900 Line operating at 69 kV at the North Eagleville / King Hill Road intersection
- Location
- Tolland County, Connecticut
- Technology
- Gas: 10.0 MW Β· Oil
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 27 June 2019
- Proposed online date
- February 2021
- Withdrawn
- August 2019
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in Tolland County
- UCONN COGEN FacilityGas Β· 24.9 MW Β· built
- EE Mansfield Center DG ClusterSolar Β· 20.0 MW Β· withdrawn
- EE Mansfield Center DG ClusterSolar + storage Β· 10.8 MW Β· withdrawn
- SolarSolar Β· 6.0 MW Β· withdrawn
- Community Power Group, 24 Middle Road, Ellington, CTSolar Β· 4.0 MW Β· withdrawn
- USS Vineyard Solar, Somers RdSolar Β· 4.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem