EE Mansfield Center DG Cluster

EE Mansfield Center DG Cluster is a 10.8 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Tolland County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2024 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1489
Grid region
ISO-NE (New England)
Connection point (POI)
EE Mansfield 12J
Location
Tolland County, Connecticut
Technology
Solar: 10.8 MW · Battery
Total requested
10.8 MW
Queue status
Withdrawn
Entered queue
17 January 2024
Proposed online date
July 2025
Withdrawn
June 2025

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Tolland County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem