United States › Grid › Interconnection queues › Connecticut

SOLAR · ISO-NE

EE Mansfield Center DG Cluster

EE Mansfield Center DG Cluster is a 20.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Tolland County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2024 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1490
Grid region
ISO-NE (New England)
Connection point (POI)
EE Card St 11F
Location
Tolland County, Connecticut
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
17 January 2024
Proposed online date
December 2024
Withdrawn
June 2025

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Tolland County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem