Wind is a 7.5 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Berkshire County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2018 (completed)
  2. Withdrawn / abandonedAug 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
769
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource 23 kV Feeder Berkshire Substation
Location
Berkshire County, Massachusetts
Technology
Wind: 7.5 MW
Total requested
7.5 MW
Queue status
Withdrawn
Entered queue
13 June 2018
Proposed online date
March 2020
Withdrawn
August 2018

Location

Marker shows the centre of Berkshire County; the queue data does not give exact sites.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Other requests in Berkshire County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem