United States › Grid › Interconnection queues › Massachusetts

SOLAR + STORAGE · ISO-NE

Group @ Berkshire 18C

Group @ Berkshire 18C is a 7.7 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Hampden County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2022 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1222
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource Berkshire 18C
Location
Hampden County, Massachusetts
Technology
Solar: 7.7 MW · Battery
Total requested
7.7 MW
Queue status
Withdrawn
Entered queue
14 January 2022
Proposed online date
November 2023
Withdrawn
June 2025

Location

Marker shows the centre of Hampden County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Hampden County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem