Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown635117.0 GW
Active in queue117.0 GW635 requests
Agreement signed57.7 GW326 requests
Withdrawn1,752246.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

635 requests Β· page 13 of 13
ProjectCapacityStatusLocationRegionQueuedOnline
Boyles Run Solar
Solar
15.9 MWAgreement signed Northumberland, PAPJM Sep 2020target 2028
Boyles Run Solar
Solar
15.9 MWAgreement signed Northumberland, PAPJM Sep 2020target 2028
South Combe
Solar
15.4 MWAgreement signed Morris, NJPJM Sep 2020target 2025
Monmouth Solar 1
Solar
15.4 MWAgreement signed Monmouth, NJPJM Sep 2020target 2026
Stony Creek Solar
Solar
15.0 MWPaused / redesign Somerset, PAPJM Mar 2020target 2025
Morgan Street-Cochranton 34.5 kV
Solar
15.0 MWPaused / redesign Crawford, PAPJM Sep 2020target 2026
Turkey Solar
Solar
14.0 MWAgreement signed Louisa, VAPJM Sep 2020target 2027
Fields 2
Solar
13.5 MWAgreement signed Greensville, VAPJM Sep 2020target 2028
Solar + storage project IC-903, Liberty County
Solar + storage
13.0 MWAgreement signed Liberty, GASoutheast Aug 2020target 2023
Bitter Ridge Wind Farm
Onshore wind
12.6 MWAgreement signed Jay, INPJM May 2020target 2025
Union City 34.5 kV
Solar
12.0 MWAgreement signed Erie, PAPJM Sep 2020target 2025
Southern Ocean Waretown Solar
Solar
12.0 MWAgreement signed Ocean, NJPJM Sep 2020target 2028
Juliet Energy
Solar Β· Juliet Energy Project, LLC
12.0 MWAgreement signed Wood, OHPJM Feb 2020target 2027
West Lorain 138 kV Power Plant
Gas
11.3 MWAgreement signed Lorain, OHPJM Sep 2020target 2028
Washington Solar PH II
Solar
11.0 MWAgreement signed Warren, NJPJM Mar 2020target 2025
Esky Solar Project
Solar
10.0 MWAgreement signed Gloucester, NJPJM Sep 2020target 2025
Aurora Battery Storage
Battery storage
10.0 MWPaused / redesign Will, ILPJM Oct 2020target 2028
Surplus; J893 (Searcy Solar)
Other
10.0 MWIn study MISO Jun 20202022
NJ Land Phase II
Solar
10.0 MWPaused / redesign Burlington, NJPJM Mar 2020target 2025
SBC Solar
Solar + storage
10.0 MWAgreement signed Dorchester, MDPJM Mar 2020target 2027
Lillie Solar
Solar
9.4 MWAgreement signed Edgecombe, NCPJM May 2020target 2028
Scout Storage I
Battery storage
9.0 MWPaused / redesign Accomack, VAPJM Jan 2020target 2026
Surplus; Gibson Generating Station
Other
7.5 MWIn study MISO Jun 2020
Barbertown Solar
Solar
7.0 MWPaused / redesign Hunterdon, NJPJM Mar 2020target 2026
Solar project AF2-088, Clearfield County
Solar
6.5 MWAgreement signed Clearfield, PAPJM Feb 2020target 2026
Furnace View Farms
Solar
5.0 MWPaused / redesign Berks, PAPJM Sep 2020target 2023
Naes
Battery storage
5.0 MWAgreement signed Burlington, NJPJM Sep 2020target 2026
NC3 Ahoskie South Solar Project
Solar + storage
5.0 MWAgreement signed Hertford, NCPJM Jun 2020target 2027
Geothermal project Company KO, Lyon County
Geothermal
4.8 MWAgreement signed Lyon, NVWest Sep 2020target 2027
Hydro project GI-2020-18, Mesa County
Hydro
4.5 MWAgreement signed Mesa, COWest Dec 2020target 2022
Greenfield CSG 1
Solar
4.0 MWPaused / redesign Erie, PAPJM Sep 2020target 2025
RHC Solar
Solar + storage
3.9 MWAgreement signed Somerset, MDPJM Apr 2020target 2024
Springfield CSG 1
Solar
3.9 MWPaused / redesign Delaware, PAPJM Sep 2020target 2024
GGC Solar
Solar + storage
2.7 MWAgreement signed Dorchester, MDPJM Mar 2020target 2024
Great Lake Growers
Solar
2.6 MWPaused / redesign Erie, PAPJM Sep 2020target 2024
Page 13 of 13

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)