United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 120
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Porter Energy Storage Battery storage · BGTF US Development Holdings LLC |
50.0 MW | In study |
| Watkins Glen Solar Solar · Watkins Glen Solar Energy Center, LLC |
50.0 MW | In study |
| Solar project AG2-616, Salem County Solar · Goldenrod Energy Center, LLC |
50.0 MW | In study |
| Solar project J2541, Graves County Solar |
50.0 MW | In study |
| Kce NY 30 Battery storage · KCE NY 30, LLC |
50.0 MW | In study |
| Battery storage project AH2-371, Jay County Battery storage |
50.0 MW | In study |
| Solar + storage project GI-2022-159, Imperial County Solar + storage |
50.0 MW | In study |
| Maple Hill-Fiddlers 1 SP (Bear Rock) Solar · CPV Maple Hill Solar, LLC |
50.0 MW | In study |
| Dart Energy Storage A1 Battery storage · Dart Energy Storage LLC |
50.0 MW | In study |
| Replace Hoot Lake units 2 and 3 (144.8 MW) with Seventeen (17) Sungrow 3 MW solar inverters and PV panels at 49.9 MW; Hoot Lake 2 & 3 Other |
49.9 MW | In study |
| Solar + storage project AH2-408, Wood County Solar + storage |
49.9 MW | In study |
| Solar project AI1-091, Seneca County Solar |
49.9 MW | In study |
| Solar project 261, Dillon County Solar |
49.9 MW | In study |
| Surplus; Merricourt Solar Other |
49.9 MW | In study |
| Solar project AI1-092, Butler County Solar |
49.9 MW | In study |
| Solar project 977831, Hoke County Solar |
49.9 MW | In study |
| Solar project AH1-282, Morrow County Solar · Woodbury Solar, LLC |
49.9 MW | In study |
| Solar + storage project AI1-150, Butler County Solar + storage |
49.9 MW | In study |
| Buttercup Wind Onshore wind · Buttercup Wind LLC |
49.9 MW | In study |
| Bayonne Energy Center III Battery storage · Bayonne Energy Center III, LLC |
49.8 MW | In study |
| Onshore wind project GEN-2026-PR3, Garfield County Onshore wind |
49.7 MW | In study |
| Onshore wind project GI-DISIS-2022-41, Kit Carson County Onshore wind |
49.6 MW | Paused / redesign |
| Steubenville Solar Solar |
49.5 MW | Paused / redesign |
| Recreation Solar Solar |
49.5 MW | Paused / redesign |
| Mount Simon Station Gas · Rochester Public Utilities |
49.5 MW | In study |
| Belen Energy Battery storage |
49.5 MW | In study |
| Brentwood Energy Storage Battery storage · the NY Power Authority |
49.1 MW | In study |
| Solar project AH2-159, Highland County Solar |
49.0 MW | In study |
| Replacing 49 MW of gas generation with BESS; Sterlington Other |
49.0 MW | In study |
| Solar project AJ1-022, Mecklenburg County Solar |
49.0 MW | In study |
| Concho Solar I Solar |
49.0 MW | Paused / redesign |
| Solar + storage project AH2-239, Trumbull County Solar + storage |
49.0 MW | In study |
| Switchgrass Solar 1 Solar |
49.0 MW | Paused / redesign |
| Solar project 961214, Chesterfield County Solar · Masked |
48.0 MW | In study |
| Solar project AI2-161, Vermillion County Solar |
48.0 MW | In study |
| Solar project AI2-151, Logan County Solar |
48.0 MW | In study |
| Other project PP00052, Chesterfield County Other |
48.0 MW | In study |
| Solar project AI2-162, Whitley County Solar |
48.0 MW | In study |
| Solar project AI2-417, Dekalb County Solar |
48.0 MW | In study |
| Onshore wind project J2312, Putnam County Onshore wind |
47.9 MW | In study |
| Solar + storage project AH2-346, Hancock County Solar + storage |
47.5 MW | In study |
| Apogee Wind II Onshore wind · King Creek Wind Farm 3, LLC |
47.3 MW | In study |
| Pouch Energy Storage System Battery storage · the NY Power Authority |
47.1 MW | In study |
| Battery storage project G1076, Yakima County Battery storage |
46.5 MW | In study |
| Gardenia Solar + storage · Gardenia Solar, LLC |
46.5 MW | In study |
| Solar project J2868, Jackson County Solar |
46.2 MW | In study |
| Solar project AI1-011, Cumberland County Solar |
46.0 MW | In study |
| South Branch Solar Solar |
46.0 MW | Paused / redesign |
| Solar project J4077, Emmons County Solar |
45.0 MW | In study |
| Solar + storage project AH2-242, Montgomery County Solar + storage |
45.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)