🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Brentwood Energy Storage

Brentwood Energy Storage is a 49.1 MW battery storage request in interconnection study in the NYISO interconnection queue, in Suffolk County, New York, connecting to LIPA.

Queue statusIn planning
  1. PlanningQueued Sep 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Aug 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
C24-281
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
the NY Power Authority
Connection point (POI)
Brentwood 69 kV Substation
Location
Suffolk County, New York
Technology
Battery: 49.1 MW
Total requested
49.1 MW
Queue status
Active
Entered queue
25 September 2024
Proposed online date
August 2028

Location

Marker shows the centre of Suffolk County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem