OTHER Β· MISO

Surplus; Merricourt Solar

Surplus; Merricourt Solar is a 49.9 MW other request in interconnection study in the MISO interconnection queue, connecting to MONTANA-DAKOTA UTILITIES CO..

Queue statusIn planning
  1. PlanningQueued Mar 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1014
Grid region
MISO (Midcontinent)
Utility / transmission owner
MONTANA-DAKOTA UTILITIES CO.
Connection point (POI)
Merricourt Wind 230kV
Technology
Solar: 49.9 MW Β· Other
Total requested
49.9 MW
Queue status
Active
Entered queue
9 March 2022
Proposed online date
September 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem