United States › Grid › Interconnection queues › Louisiana

OTHER · MISO

Replacing 49 MW of gas generation with BESS; Sterlington

Replacing 49 MW of gas generation with BESS; Sterlington is a 49.0 MW other request in interconnection study in the MISO interconnection queue, in Ouachita County, Louisiana, connecting to ENTERGY LOUISIANA.

Queue statusIn planning
  1. PlanningQueued Oct 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jan 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R1039
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY LOUISIANA
Connection point (POI)
Sterlington 115kV
Location
Ouachita County, Louisiana
Technology
Solar: 49.0 MW · Other
Total requested
49.0 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
5 October 2023
Proposed online date
January 2025

Location

Marker shows the centre of Ouachita County; the queue data does not give exact sites.

Power plants in Louisiana · Transmission lines in Louisiana

Other requests in Ouachita County