United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J1883, Ouachita Parish County
Solar project J1883, Ouachita Parish County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Ouachita Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2021 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1883
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- Rilla 115kV
- Location
- Ouachita Parish County, Louisiana
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 21 July 2021
- Proposed online date
- June 2023
- Withdrawn
- March 2025
Location
Marker shows the centre of Ouachita Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Ouachita Parish County
- Solar project J1239, Ouachita Parish CountySolar Β· 100 MW Β· under construction
- Battery storage project J1602, Ouachita Parish CountyBattery storage Β· 25.0 MW Β· agreement signed
- Solar project J2708, Ouachita Parish CountySolar Β· 500 MW Β· in study
- Solar project J2704, Ouachita Parish CountySolar Β· 500 MW Β· in study
- Solar project J2317, Ouachita Parish CountySolar Β· 225 MW Β· in study
- Solar project J2816, Ouachita Parish CountySolar Β· 100 MW Β· in study
- Battery storage project J4140, Ouachita Parish CountyBattery storage Β· 100 MW Β· in study
- Solar project J2917, Ouachita Parish CountySolar Β· 80.0 MW Β· in study
- Solar project J4049, Ouachita Parish CountySolar Β· 75.0 MW Β· in study
- Replacing 49 MW of gas generation with BESS; SterlingtonOther Β· 49.0 MW Β· in study
- Gas project J4022, Ouachita Parish CountyGas Β· 1,509 MW Β· withdrawn
- Solar project J852, Ouachita Parish CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem