United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA (2021 requests) — page 10
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project G0713, Morrow County Solar |
100 MW | In study |
| Solar + storage project C1-27, Benton County Solar + storage · Solway Solar Energy LLC |
100 MW | Paused / redesign |
| Solar + storage project J2193, Waushara County Solar + storage |
100 MW | In study |
| Battery storage project 15, Sacramento County Battery storage |
100 MW | In study |
| Sunsetter BESS Battery storage · CED Development Inc. |
100 MW | In study |
| Solar project J1993, Columbia County Solar |
99.0 MW | In study |
| Solar project J2208, De Soto Parish County Solar |
99.0 MW | In study |
| Leitrim 1 Solar Solar · Leitsol LLC |
98.4 MW | In study |
| Agricola Wind Onshore wind · Agricola Wind LLC |
97.0 MW | In study |
| Solar + storage project GEN-2021-077, Pettis County Solar + storage |
95.0 MW | In study |
| Rosscommon Solar Solar · Roscsol, LLC |
91.0 MW | In study |
| Solar project AH2-030, Jefferson County Solar |
90.0 MW | In study |
| North Seneca Solar Project, LLC Solar · North Seneca Solar Project |
90.0 MW | In study |
| Solar + storage project GI-2021-148, Imperial County Solar + storage |
90.0 MW | In study |
| York Run Solar Solar · York Run Solar, LLC |
90.0 MW | In study |
| Battery storage project 124, Pierce County Battery storage |
85.0 MW | Paused / redesign |
| Lupinus Storage 1 Solar + storage · Lupinus Solar, LLC |
84.0 MW | In study |
| Harper Energy Storage Battery storage · VESI 31 LLC |
82.4 MW | In study |
| Sunbelt Solar Solar + storage · Rose Hill Solar LLC |
81.5 MW | In study |
| Long Cane Solar Solar + storage |
80.0 MW | In study |
| Solar + storage project 412, Gallatin County Solar + storage |
80.0 MW | Paused / redesign |
| Solar + storage project IC-999, Baldwin County Solar + storage |
80.0 MW | Paused / redesign |
| Solar + storage project IC-971, Lowndes County Solar + storage |
80.0 MW | Paused / redesign |
| Solar + storage project IC-954, Conecuh County Solar + storage |
80.0 MW | Paused / redesign |
| Backwater Solar Solar |
80.0 MW | Paused / redesign |
| Solar + storage project IC-997, Baldwin County Solar + storage |
80.0 MW | Paused / redesign |
| Solar + storage project IC-1000, Baldwin County Solar + storage |
80.0 MW | Paused / redesign |
| Solar + storage project IC-979, Conecuh County Solar + storage |
80.0 MW | Paused / redesign |
| Solar project IC-1001, Early County Solar |
80.0 MW | Paused / redesign |
| Solar project AH2-002, Barren County Solar |
80.0 MW | In study |
| Solar project IC-943, Talladega County Solar |
80.0 MW | Paused / redesign |
| Solar project IC-975, Dale County Solar |
80.0 MW | Paused / redesign |
| Holtsville Brookhaven Battery Storage Battery storage · Holtsville Brookhaven Battery Storage LLC |
79.9 MW | In study |
| Valetudo Energy Storage Battery storage |
79.6 MW | In study |
| Solar project IC-1002, Decatur County Solar |
78.0 MW | Paused / redesign |
| Naduah Solar Solar · Gransolar Texas Fifteen, LLC |
77.6 MW | In study |
| Solar project J2316, Dickinson County Solar |
77.5 MW | In study |
| Eytcheson Ranches Solar Solar · Gransolar Texas Fourteen, LLC |
76.4 MW | In study |
| Palmetto Energy Storage Battery storage |
75.6 MW | In study |
| Battery storage project G0717, Klickitat County Battery storage |
75.0 MW | In study |
| Solar project 167, Darlington County Solar |
75.0 MW | Paused / redesign |
| Solar project J2068, Pierce County Solar |
75.0 MW | In study |
| Battery storage project GI-2021-146, Imperial County Battery storage |
75.0 MW | In study |
| Solar project J2010, Arkansas County Solar |
75.0 MW | In study |
| Solar + storage project GI-2021-147, Imperial County Solar + storage |
75.0 MW | In study |
| Photo BESS 1 Solar + storage · CED Development Inc. |
75.0 MW | In study |
| Solar + storage project JEA-Q009, Duval County Solar + storage |
74.9 MW | In study |
| Solar project 293, Alachua County Solar · Pleasant Solar, LLC |
74.9 MW | Paused / redesign |
| Solar project 424D, Madison County Solar · FPL |
74.5 MW | In study |
| Solar project 424A, Leon County Solar · FPL |
74.5 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)172 · 56.8 GW
- CAISO (California)70 · 31.5 GW
- ERCOT (Texas)116 · 23.2 GW
- MISO (Midcontinent)126 · 22.4 GW
- Southeast (non-ISO utilities)44 · 9,966 MW
- SPP (Southwest Power Pool)25 · 5,570 MW
- PJM (Mid-Atlantic, Midwest)49 · 2,072 MW
- NYISO (New York)11 · 991 MW
- ISO-NE (New England)3 · 525 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)