Requests shown616153.0 GW
Active in queue227.7 GW896 requests
Agreement signed73.3 GW270 requests
Withdrawn2,149339.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

616 requests · page 10 of 13
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project G0713, Morrow County
Solar
100 MWIn study Morrow, ORWest Nov 2021target 2026
Solar + storage project C1-27, Benton County
Solar + storage · Solway Solar Energy LLC
100 MWPaused / redesign Benton, WAWest May 2021target 2023
Solar + storage project J2193, Waushara County
Solar + storage
100 MWIn study Waushara, WIMISO Nov 2021target 2024
Battery storage project 15, Sacramento County
Battery storage
100 MWIn study Sacramento, CAWest Dec 2021target 2027
Sunsetter BESS
Battery storage · CED Development Inc.
100 MWIn study Uvalde, TXERCOT Feb 2021target 2027
Solar project J1993, Columbia County
Solar
99.0 MWIn study Columbia, WIMISO Dec 2021target 2025
Solar project J2208, De Soto Parish County
Solar
99.0 MWIn study De Soto Parish, LAMISO Aug 2021target 2024
Leitrim 1 Solar
Solar · Leitsol LLC
98.4 MWIn study Hill, TXERCOT Jan 2021target 2027
Agricola Wind
Onshore wind · Agricola Wind LLC
97.0 MWIn study Cayuga, NYNYISO Mar 2021target 2027
Solar + storage project GEN-2021-077, Pettis County
Solar + storage
95.0 MWIn study Pettis, MOSPP Apr 2021target 2027
Rosscommon Solar
Solar · Roscsol, LLC
91.0 MWIn study Lamar, TXERCOT Mar 2021target 2027
Solar project AH2-030, Jefferson County
Solar
90.0 MWIn study Jefferson, WVPJM Nov 2021target 2025
North Seneca Solar Project, LLC
Solar · North Seneca Solar Project
90.0 MWIn study Seneca, NYNYISO May 2021target 2027
Solar + storage project GI-2021-148, Imperial County
Solar + storage
90.0 MWIn study Imperial, CAWest Nov 2021target 2027
York Run Solar
Solar · York Run Solar, LLC
90.0 MWIn study Chautauqua, NYNYISO Mar 2021target 2028
Battery storage project 124, Pierce County
Battery storage
85.0 MWPaused / redesign Pierce, WAWest Aug 2021target 2029
Lupinus Storage 1
Solar + storage · Lupinus Solar, LLC
84.0 MWIn study Franklin, TXERCOT Dec 2021target 2027
Harper Energy Storage
Battery storage · VESI 31 LLC
82.4 MWIn study Cameron, TXERCOT Dec 2021target 2028
Sunbelt Solar
Solar + storage · Rose Hill Solar LLC
81.5 MWIn study Kaufman, TXERCOT Mar 2021target 2026
Long Cane Solar
Solar + storage
80.0 MWIn study Troup, GASoutheast Jul 2021target 2024
Solar + storage project 412, Gallatin County
Solar + storage
80.0 MWPaused / redesign Gallatin, MTWest Jun 2021
Solar + storage project IC-999, Baldwin County
Solar + storage
80.0 MWPaused / redesign Baldwin, ALSoutheast Dec 2021target 2026
Solar + storage project IC-971, Lowndes County
Solar + storage
80.0 MWPaused / redesign Lowndes, ALSoutheast Jul 2021target 2026
Solar + storage project IC-954, Conecuh County
Solar + storage
80.0 MWPaused / redesign Conecuh, ALSoutheast Apr 2021target 2026
Backwater Solar
Solar
80.0 MWPaused / redesign Cooke, TXERCOT Aug 2021target 2024
Solar + storage project IC-997, Baldwin County
Solar + storage
80.0 MWPaused / redesign Baldwin, ALSoutheast Dec 2021target 2026
Solar + storage project IC-1000, Baldwin County
Solar + storage
80.0 MWPaused / redesign Baldwin, ALSoutheast Dec 2021target 2026
Solar + storage project IC-979, Conecuh County
Solar + storage
80.0 MWPaused / redesign Conecuh, ALSoutheast Aug 2021target 2026
Solar project IC-1001, Early County
Solar
80.0 MWPaused / redesign Early, GASoutheast Dec 2021target 2025
Solar project AH2-002, Barren County
Solar
80.0 MWIn study Barren, KYPJM Oct 2021target 2024
Solar project IC-943, Talladega County
Solar
80.0 MWPaused / redesign Talladega, ALSoutheast Mar 2021target 2025
Solar project IC-975, Dale County
Solar
80.0 MWPaused / redesign Dale, ALSoutheast Jul 2021target 2025
Holtsville Brookhaven Battery Storage
Battery storage · Holtsville Brookhaven Battery Storage LLC
79.9 MWIn study Suffolk, NYNYISO Sep 2021target 2026
Valetudo Energy Storage
Battery storage
79.6 MWIn study Madera, CACAISO Apr 2021target 2028
Solar project IC-1002, Decatur County
Solar
78.0 MWPaused / redesign Decatur, GASoutheast Dec 2021target 2025
Naduah Solar
Solar · Gransolar Texas Fifteen, LLC
77.6 MWIn study Limestone, TXERCOT Sep 2021target 2027
Solar project J2316, Dickinson County
Solar
77.5 MWIn study Dickinson, MIMISO Sep 2021target 2023
Eytcheson Ranches Solar
Solar · Gransolar Texas Fourteen, LLC
76.4 MWIn study Navarro, TXERCOT Sep 2021target 2028
Palmetto Energy Storage
Battery storage
75.6 MWIn study Alameda, CACAISO Apr 2021target 2030
Battery storage project G0717, Klickitat County
Battery storage
75.0 MWIn study Klickitat, WAWest Dec 2021target 2024
Solar project 167, Darlington County
Solar
75.0 MWPaused / redesign Darlington, SCSoutheast Oct 2021target 2025
Solar project J2068, Pierce County
Solar
75.0 MWIn study Pierce, WIMISO Jul 2021target 2024
Battery storage project GI-2021-146, Imperial County
Battery storage
75.0 MWIn study Imperial, CAWest Nov 2021target 2025
Solar project J2010, Arkansas County
Solar
75.0 MWIn study Arkansas, ARMISO Aug 2021target 2028
Solar + storage project GI-2021-147, Imperial County
Solar + storage
75.0 MWIn study Imperial, CAWest Nov 2021target 2024
Photo BESS 1
Solar + storage · CED Development Inc.
75.0 MWIn study Uvalde, TXERCOT Oct 2021target 2027
Solar + storage project JEA-Q009, Duval County
Solar + storage
74.9 MWIn study Duval, FLSoutheast Jul 2021target 2026
Solar project 293, Alachua County
Solar · Pleasant Solar, LLC
74.9 MWPaused / redesign Alachua, FLSoutheast Aug 2021target 2024
Solar project 424D, Madison County
Solar · FPL
74.5 MWIn study Madison, FLSoutheast Aug 2021target 2027
Solar project 424A, Leon County
Solar · FPL
74.5 MWIn study Leon, FLSoutheast Aug 2021target 2033
Page 10 of 13

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)