United States › Grid › Interconnection queues › California

SOLAR + STORAGE · WEST

Solar + storage project GI-2021-148, Imperial County

Solar + storage project GI-2021-148, Imperial County is a 90.0 MW solar + storage request in interconnection study in the West interconnection queue, in Imperial County, California, connecting to Imperial Irrigation District.

Queue statusIn planning
  1. PlanningQueued Nov 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-2021-148
Grid region
West (non-ISO utilities)
Utility / transmission owner
Imperial Irrigation District
Connection point (POI)
92kV Anza Substation
Location
Imperial County, California
Technology
Solar: 90.0 MW · Battery
Total requested
90.0 MW
Study phase
System Impact Study
Queue status
Active
Entered queue
17 November 2021
Proposed online date
October 2027

Location

Marker shows the centre of Imperial County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Imperial County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem