United States › Grid › Interconnection queues › Georgia

SOLAR + STORAGE · SOUTHEAST

Long Cane Solar

Long Cane Solar is a 80.0 MW solar + storage request in interconnection study in the Southeast interconnection queue, in Troup County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Jul 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Nov 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-153
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Glassbridge - Glassbridge Tap 115 kV TL
Location
Troup County, Georgia
Technology
Solar: 80.0 MW · Battery
Total requested
80.0 MW
Study phase
System Impact Study
Queue status
Active
Entered queue
19 July 2021
Proposed online date
November 2024

Location

Marker shows the centre of Troup County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Troup County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem