SOLAR · NYISONorth Seneca Solar Project, LLC
North Seneca Solar Project, LLC is a 90.0 MW solar request in interconnection study in the NYISO interconnection queue, in Seneca County, New York, connecting to NM-NG.
Queue statusIn planning
- PlanningQueued May 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 1188
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- North Seneca Solar Project
- Connection point (POI)
- Hooks Road - Elbridge 115kV line#7
- Location
- Seneca County, New York
- Technology
- Solar: 90.0 MW
- Total requested
- 90.0 MW
- Study phase
- SRIS, FS
- Queue status
- Active
- Entered queue
- 27 May 2021
- Proposed online date
- September 2027
Location
Marker shows the centre of Seneca County; the queue data does not give exact sites.
Other requests in Seneca County
- Trelina Energy StorageBattery storage · 120 MW · in study
- Trelina Solar Energy CenterSolar · 79.8 MW · in study
- Seneca Energy ExpansionOther · 17.6 MW · built
- Declaration Energy CenterSolar + storage · 550 MW · withdrawn
- Declaration Energy CenterSolar · 300 MW · withdrawn
- Crystal Storage ProjectBattery storage · 175 MW · withdrawn
- Gravel Road SolarSolar · 128 MW · withdrawn
- Gravel Road SolarSolar · 128 MW · withdrawn
- Gravel Road SolarSolar · 126 MW · withdrawn
- North SenecaSolar · 90.0 MW · withdrawn
- Suffragette Solar Energy CenterSolar · 50.0 MW · withdrawn
- North Seneca StorageBattery storage · 19.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem