SOLAR + STORAGE · NYISODeclaration Energy Center
Declaration Energy Center is a 550 MW solar + storage request withdrawn in the NYISO interconnection queue, in Seneca County, New York, connecting to NYPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-204
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYPA
- Developer
- Declaration Energy Center, LLC
- Connection point (POI)
- Clay - Pannell (Station 122), Line #1 345 kV line
- Location
- Seneca County, New York
- Technology
- Solar: 550 MW · Battery
- Total requested
- 550 MW
- Queue status
- Withdrawn
- Entered queue
- 19 September 2024
Location
Marker shows the centre of Seneca County; the queue data does not give exact sites.
Other requests in Seneca County
- Trelina Energy StorageBattery storage · 120 MW · in study
- North Seneca Solar Project, LLCSolar · 90.0 MW · in study
- Trelina Solar Energy CenterSolar · 79.8 MW · in study
- Seneca Energy ExpansionOther · 17.6 MW · built
- Declaration Energy CenterSolar · 300 MW · withdrawn
- Crystal Storage ProjectBattery storage · 175 MW · withdrawn
- Gravel Road SolarSolar · 128 MW · withdrawn
- Gravel Road SolarSolar · 128 MW · withdrawn
- Gravel Road SolarSolar · 126 MW · withdrawn
- North SenecaSolar · 90.0 MW · withdrawn
- Suffragette Solar Energy CenterSolar · 50.0 MW · withdrawn
- North Seneca StorageBattery storage · 19.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem