United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOGravel Road Solar
Gravel Road Solar is a 128 MW solar request withdrawn in the NYISO interconnection queue, in Seneca County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1236
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Gravel Road Solar, LLC
- Connection point (POI)
- Station 127 (Hook Rd) -Elbridge and Mortimer-Elbridge 115 kV lines
- Location
- Seneca County, New York
- Technology
- Solar: 128 MW
- Total requested
- 128 MW
- Queue status
- Withdrawn
- Entered queue
- 23 August 2021
Location
Marker shows the centre of Seneca County; the queue data does not give exact sites.
Other requests in Seneca County
- Trelina Energy StorageBattery storage Β· 120 MW Β· in study
- North Seneca Solar Project, LLCSolar Β· 90.0 MW Β· in study
- Trelina Solar Energy CenterSolar Β· 79.8 MW Β· in study
- Seneca Energy ExpansionOther Β· 17.6 MW Β· built
- Declaration Energy CenterSolar + storage Β· 550 MW Β· withdrawn
- Declaration Energy CenterSolar Β· 300 MW Β· withdrawn
- Crystal Storage ProjectBattery storage Β· 175 MW Β· withdrawn
- Gravel Road SolarSolar Β· 128 MW Β· withdrawn
- Gravel Road SolarSolar Β· 126 MW Β· withdrawn
- North SenecaSolar Β· 90.0 MW Β· withdrawn
- Suffragette Solar Energy CenterSolar Β· 50.0 MW Β· withdrawn
- North Seneca StorageBattery storage Β· 19.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem