Home › Grid infrastructure › Connection queue
NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Ardkinglas Onshore wind · Scottish Power Renewables (UK) Limited |
19 MW | |
| Culligran (part of the Beauly Cascade) Hydro and pumped storage · Sse Generation Limited |
19 MW | |
| Conrad (Swindon) Limited Battery storage · Conrad (Swindon) Limited |
19 MW | |
| Conrad (Winchester) Limited Battery storage · Conrad (Winchester) Limited |
19 MW | |
| Jamesfield Farm Phase 2 Battery Storage Battery storage · Harmony Jf Limited |
19 MW | |
| Mossford (part of the Conon Cascade) Hydro and pumped storage · Sse Generation Limited |
19 MW | |
| Livishie (part of the Moriston Cascade) Hydro and pumped storage · Sse Generation Limited |
18 MW | |
| Orrin (part of the Conon Cascade) Hydro and pumped storage · Sse Generation Limited |
18 MW | |
| Quoich (part of the Garry Cascade) Hydro and pumped storage · Sse Generation Limited |
18 MW | |
| Tullymurdoch Wind Farm Onshore wind · Tullymurdoch Limited |
18 MW | |
| Tullo Wind Farm Onshore wind · Tullo Wind Farm Limited |
17 MW | |
| Finlarig Hydro and pumped storage · Sse Generation Limited |
17 MW | |
| Plymouth Rock Gas · Viridis 178 Limited |
15 MW | |
| Glanford Other · Epr Glanford Limited |
15 MW | |
| Green Frog @ Letchworth Gas · Viridis 178 Limited |
15 MW | |
| Nant Hydro and pumped storage · Sse Generation Limited |
15 MW | |
| Pitlochry (part of the Clunie Cascade) Hydro and pumped storage · Sse Generation Limited |
15 MW | |
| Torr Achilty (part of the Conon Cascade) Hydro and pumped storage · Sse Generation Limited |
15 MW | |
| Trafalgar Park Gas · Viridis 178 Limited |
14 MW | |
| Crystal Rig III Wind Farm Onshore wind · Crystal Rig III Limited |
14 MW | |
| Gordonstown Hill Wind Farm Onshore wind · Gordonstown Hill Wind Farm Limited |
13 MW | |
| Green Frog at Lester Way Gas · Viridis 178 Limited |
12 MW | |
| Broadditch BESS Battery storage · Harmony BD Ltd |
12 MW | |
| Cashlie (Part of Killin Cascade Hydro Scheme) Hydro and pumped storage · Sse Generation Limited |
11 MW | |
| Abedare Gas · UK Power Reserve Limited |
10 MW | |
| Cwm Dyli Hydro and pumped storage · RWE Generation UK Plc |
10 MW | |
| Huntworth Gas · UK Power Reserve Limited |
10 MW | |
| Hutton Battery Storage Battery storage · Osspv001 Limited |
10 MW | |
| Sevington Gas · UK Power Reserve Limited |
10 MW | |
| Solutia Gas · UK Power Reserve Limited |
10 MW | |
| Pogbie Wind Farm Onshore wind · Pogbie Wind Farm (Grid) Limited |
9.6 MW | |
| Brownieleys Onshore wind · Brownieleys Renewables LLP |
7.5 MW | |
| Holes Bay Battery storage · Harmony Hb Limited |
7.5 MW | |
| Green frog @ The Drove Gas · Viridis 178 Limited |
6 MW | |
| PeakGen BEGA - Coventry Gas · Peak Gen Top Co Limited |
6 MW | |
| PeakGen BEGA - Hatfield Gas · Peak Gen Top Co Limited |
6 MW | |
| PeakGen BEGA - Haydock Gas · Peak Gen Power Limited |
6 MW | |
| Craig II Wind Farm Onshore wind · Craig Wind Farm Limited |
4.7 MW | |
| Keith Hill Wind Farm Onshore wind · Diamond Wind Limited |
4.5 MW | |
| Lubreoch Hydro (Part of Killin Cascade Hydro Scheme) Hydro and pumped storage · Sse Generation Limited |
4 MW | |
| PeakGen BEGA - Didcot Gas · Peak Gen Power Limited |
4 MW | |
| Beatrice Sync Comp Other · Tinz Programme 1 Projectco 3 Limited |
0 MW | |
| Hunterston Nuclear · Nuclear Restoration Services Limited |
0 MW | |
| Dungeness B Nuclear · EDF Energy Nuclear Generation Limited |
0 MW | |
| Gretna Synchronous Compensation Other · Gretna Grid Services Limited |
0 MW | |
| Keith 132 Greener Grid Park Battery storage · Keith Storage Solutions Limited |
0 MW | |
| Lister Drive 275kV Other · Lister Drive Solutions Limited |
0 MW | |
| Mersey Reactive 1 Other · Mersey Reactive Power Limited |
0 MW | |
| Rothienorman Sync Comp Other · Rothienorman Grid Services Limited |
0 MW | |
| Thurso South Synchronous Compensation Other · Thurso Grid Services Limited |
0 MW |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.