Grid connection projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown30385.5 GW in total
In planning303scoping or awaiting consent
Consented or building52closest to connecting
Built89connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

303 projects · page 5 of 7
ProjectCapacityStageConnection siteFrom
Coille Beith Wind Farm
Onshore wind · Coille Beith Wind Farm Limited
79 MWScoping Oykel Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Creachan Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
79 MWScoping Creachan Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Grimshader Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
79 MWScoping Grimshader Wind Farm Substation132 KV
SSEN Transmission (north Scotland)
Oct 2033
Kilbraur North Wind Farm
Onshore wind · Edf Energy Renewables Limited
79 MWScoping Kilbraur Wind Farm Substation
SSEN Transmission (north Scotland)
Oct 2031
Tarvie Wind Farm
Wind + storage · Koehler Renewable Energy UK Limited
77 MWScoping Beauly substation 275KV
SSEN Transmission (north Scotland)
Oct 2033
Abhainn Dubh Wind Farm
Onshore wind · E Power Limited
75 MWScoping Abhainn Dubh Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
May 2029
Windburn
Wind + storage · Windburn Wind Farm Limited
75 MWScoping Braco West GSP
SSEN Transmission (north Scotland)
Oct 2035
Strath Oykel Wind Farm
Wind + storage · Energyfarm Strath Oykel LLP
74 MWAwaiting Consents Shin 1 GSP
SSEN Transmission (north Scotland)
Oct 2032
Craig Watch Wind Farm
Onshore wind · Craig Watch Wind Farm Limited
73 MWAwaiting Consents Craig Watch Wind Farm 132Kv Substation
SSEN Transmission (north Scotland)
May 2031
Narachan Wind Farm
Onshore wind · Energyfarm UK Narachan LLP
73 MWScoping Carradale 1 GSP
SSEN Transmission (north Scotland)
Apr 2030
Corriegarth 2 Wind Farm
Onshore wind · Corriegarth 2 Wind Farm Limited
70 MWScoping Corriegarth 132/33kV substation
SSEN Transmission (north Scotland)
Jul 2027
Tormsdale Windfarm
Solar + storage · Asuk Holdco 1 Limited
70 MWScoping Mybster 3 132/33kV Substation
SSEN Transmission (north Scotland)
Jun 2028
Correen Hills Wind Farm
Onshore wind · Edf Energy Renewables Limited
68 MWScoping Correen Hills Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Sep 2031
Ladyfield Renewable Energy Park
Battery storage · Ladyfield Renewable Energy Park Ltd
68 MWScoping Creag Dhubh 275/132/33kV
SSEN Transmission (north Scotland)
Oct 2029
Bilbo Farm
Solar + storage · Lel Bilbo Solar Limited
67 MWScoping Strichen 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2033
Heastabhal Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
66 MWScoping Heastabhal Wind Farm Substation 132 KV
SSEN Transmission (north Scotland)
Oct 2033
Allt Domhain Wind Farm
Onshore wind · Energyfarm Allt Domhain Ltd
65 MWScoping Carradale 3 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2035
Crakaig Wind Energy Hub
Wind + storage · Crakaig Wind Energy Hub Limited
60 MWScoping Brora 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2034
Killean Wind Farm
Onshore wind · Renewable Energy Systems Limited
60 MWScoping Carradale 3 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2034
Kirkton Wind Farm
Onshore wind · Kirkton Wind Farm Limited
60 MWAwaiting Consents Connagill 275kV Substation
SSEN Transmission (north Scotland)
Oct 2029
Balnespick Wind Farm
Wind + storage · Fred Olsen Renewables Limited
58 MWScoping Balnespick Wind Farm 132kV/33kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Beinn Ghlas
Onshore wind · Headwind Development Services Limited
58 MWAwaiting Consents Taynuilt GSP
SSEN Transmission (north Scotland)
Oct 2034
Melvich Wind Energy Hub
Wind + storage · Melvich Wind Energy Hub Limited
58 MWAwaiting Consents Melvich Community Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Leuchland Energy Centre A
Solar + storage · Leuchland Energy Centre Limited
57 MWScoping Leuchland Farm IDNO
SSEN Transmission (north Scotland)
Oct 2033
Leuchland Energy Centre B
Solar + storage · Leuchland Energy Centre Limited
57 MWScoping Leuchland Farm IDNO
SSEN Transmission (north Scotland)
Oct 2033
High Brenfield 1
Onshore wind · High Brenfield Wind Farm Limited
53 MWScoping Craig Murrail 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2034
Watten Wind Farm
Onshore wind · Edf Energy Renewables Limited
53 MWScoping Mybster 3 132/33kV Substation
SSEN Transmission (north Scotland)
Jun 2028
50MW BESS Connagill
Battery storage · Cerulisia Ltd
50 MWScoping New Connagill 275/132kV Substation
SSEN Transmission (north Scotland)
Oct 2031
Allt an Tuir Renewable Energy Park
Solar + storage · Allt An Tuir Renewable Energy Park Limited
50 MWScoping Shin 1 GSP
SSEN Transmission (north Scotland)
Jun 2031
Aultcraggie BESS
Battery storage · Opde UK Limited
50 MWScoping Brora GSP
SSEN Transmission (north Scotland)
Oct 2034
Breakish Windfarm
Onshore wind · Asuk Holdco 2 Limited
50 MWScoping Breakish 132kV Substation
SSEN Transmission (north Scotland)
May 2029
Garlogie B-1
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production B 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie B-2
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production B 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie C-1
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production C 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie C-2
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production C 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie PV and BESS A-1
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production A 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie PV and BESS A-2
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production A 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Jamesfield 3
Battery storage · Harmony Energy Limited
50 MWScoping New Abernethy 132kV
SSEN Transmission (north Scotland)
Oct 2037
Learney BESS
Battery storage · Igp Solar 22 Limited
50 MWScoping Learney BESS 132Kv
SSEN Transmission (north Scotland)
Oct 2032
Locharber
Solar + storage · Lochaber Energy Centre Limited
50 MWScoping Arbroath GSP
SSEN Transmission (north Scotland)
Oct 2032
Nether Pitforthie BESS
Battery storage · Opdenergy UK 14 Limited
50 MWScoping Fiddes 275/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2032
Newton of Park BESS 2
Battery storage · Opdenergy UK 16 Limited
50 MWScoping Nairn 132/33kV Grid Supply Point Substation
SSEN Transmission (north Scotland)
Jan 2028
Project Flora Peterhead
Offshore wind · Jera Nex Bp North East Limited
50 MWScoping Peterhead Grange GSP
SSEN Transmission (north Scotland)
Oct 2033
West Torrisdale
Onshore wind · Esb Asset Development UK Limited
50 MWScoping Carradale 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
May 2028
Yamal BESS
Battery storage · Opde UK Limited
50 MWScoping MacDuff 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2033
Achanalt Battery Storage
Battery storage · Adtek Limited
50 MWScoping Grudie Bridge GSP
SSEN Transmission (north Scotland)
Oct 2027
Carseview Road BESS
Battery storage · Vital Energi Solutions Limited
50 MWScoping Lunanhead 2 GSP
SSEN Transmission (north Scotland)
Oct 2032
Coupar Solar Farm
Solar · Coupar Two Limited
50 MWScoping Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Apr 2027
Craigend
Solar · Renewable Energy Systems Limited
50 MWScoping Arbroath GSP
SSEN Transmission (north Scotland)
Jun 2032
Drumlithie Battery Storage
Battery storage · Drumlithie Battery Limited
50 MWScoping Fetteresso GSP
SSEN Transmission (north Scotland)
Oct 2028

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.