🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,590616.3 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,590 projects · page 28 of 32
ProjectCapacityStageConnection siteFrom
Bicker Fen 2 Solar
Solar + storage · Agr Solar 3 Limited
57 MWScoping Bicker Fen 400kV Substation
National Grid (England & Wales)
Apr 2033
Biggleswade BESS
Battery storage · Central Bedfordshire Council
57 MWScoping Biggleswade 400kV Substation
National Grid (England & Wales)
Sep 2029
Bolney (tertiary)
Solar + storage · Bolney Green Limited
57 MWScoping Bolney 400kV Substation
National Grid (England & Wales)
May 2028
Bramford 2 GEC (Ethos Green)
Solar + storage · Bramford 2 Green Energy Centre Ltd
57 MWAwaiting Consents Bramford 400kV Substation
National Grid (England & Wales)
Jul 2032
Bridgwater (tertiary)
Solar + storage · Enso Green Holdings H Limited
57 MWScoping Bridgwater 400/132kV Substation
National Grid (England & Wales)
Aug 2028
Bridgwater 2 (tertiary) - New Conn
Solar + storage · Bridgwater Green Limited
57 MWScoping Bridgewater 400kV Substation
National Grid (England & Wales)
Aug 2029
Burwell (Tertiary)
Battery storage · Pivoted Power LLP
57 MWAwaiting Consents Burwell Main 400kV Substation
National Grid (England & Wales)
Jun 2029
Canterbury Tertiary
Solar + storage · Enso Green Holdings L Limited
57 MWAwaiting Consents Canterbury North 400kV Substation
National Grid (England & Wales)
Oct 2031
Capenhurst Tertiary
Solar + storage · Enso Green Holdings Q Limited
57 MWScoping Capenhurst 400kV Substation
National Grid (England & Wales)
Oct 2027
Carrington
Battery storage · Pivoted Power LLP
57 MWAwaiting Consents Carrington 275kV Substation
National Grid (England & Wales)
Oct 2028
Cowley (Tertiary)
Solar + storage · Cowley Baldon Green Limited
57 MWScoping Cowley 400kV Substation
National Grid (England & Wales)
Nov 2025
ER BUR Energy
Solar + storage · Er Project Development Co Limited
57 MWScoping Burwell South 400kV Substation
National Grid (England & Wales)
Oct 2033
ER HTP Energy
Solar + storage · Er Project Development Co Limited
57 MWScoping Hawthorn Pit 400kV Substation
National Grid (England & Wales)
Jun 2034
ER LBR Energy
Solar + storage · Er Project Development Co Limited
57 MWScoping Littlebrook 400kV Substation
National Grid (England & Wales)
Oct 2029
Exeter (Tertiary)
Solar + storage · Pivoted Power LLP
57 MWScoping Exeter 400kV Substation
National Grid (England & Wales)
Dec 2036
Exeter Main Tertiary
Gas · Exeter Main Battery Limited
57 MWScoping Exeter 400kV Substation
National Grid (England & Wales)
May 2024
Fleet Solar PV
Solar · Fleet Solar Limited
57 MWAwaiting Consents Fleet 400kV Substation
National Grid (England & Wales)
Aug 2028
Kirkby (Tertiary)
Solar + storage · Pivoted Power LLP
57 MWScoping Kirkby 275/33kV Substation
National Grid (England & Wales)
Aug 2027
Landulph
Solar + storage · Pivoted Power LLP
57 MWScoping Landulph 400kV Substation
National Grid (England & Wales)
Oct 2028
Leuchland Energy Centre A
Solar + storage · Leuchland Energy Centre Limited
57 MWScoping Leuchland Farm IDNO
SSEN Transmission (north Scotland)
Oct 2033
Leuchland Energy Centre B
Solar + storage · Leuchland Energy Centre Limited
57 MWScoping Leuchland Farm IDNO
SSEN Transmission (north Scotland)
Oct 2033
Lister Drive Shaw
Battery storage · Carnegie (BES) Ltd
57 MWScoping Lister Drive 275kV Substation
National Grid (England & Wales)
Sep 2026
Little Horsted
Solar + storage · Lightsource Renewable UK Development Limited
57 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Lovedean (Tertiary)
Solar + storage · Lovedean Green Limited
57 MWScoping Lovedean 400kV Substation
National Grid (England & Wales)
Oct 2029
Melksham (Tertiary)
Solar + storage · Melksham Calne Green Limited
57 MWScoping Melksham 400kV Substation
National Grid (England & Wales)
Jun 2026
Norton
Battery storage · Baywa R.e. UK Limited
57 MWAwaiting Consents Norton 275kV Substation
National Grid (England & Wales)
Jun 2029
Noventum Hawthorn Pit
Solar + storage · Noventum Power Solar 2 Limited
57 MWScoping Wearside Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Oldbury (Tertiary)
Battery storage · Pivoted Power LLP
57 MWAwaiting Consents Oldbury 275kV Substation
National Grid (England & Wales)
Oct 2037
Penwortham BESS
Battery storage · Cse28 Limited
57 MWScoping Penwortham 400kV Substation
National Grid (England & Wales)
Jun 2031
Pivot Power Harker Hybrid
Solar + storage · Pivoted Power LLP
57 MWScoping Harker 400/132KV Substation
National Grid (England & Wales)
Oct 2029
Plas Power Estate North Tertiary
Solar + storage · Lightsource Spv 192 Limited
57 MWScoping Legacy 400kV Substation
National Grid (England & Wales)
May 2028
Rayleigh 2 Tertiary
Solar + storage · Enso Green Holdings J Limited
57 MWScoping Rayleigh Main 400kV Substation
National Grid (England & Wales)
Oct 2028
Walpole
Solar + storage · Hollygreen Energyfarm Limited
57 MWScoping Walpole 400kV substations
National Grid (England & Wales)
Oct 2030
Walpole 1 (Tertiary)
Solar + storage · Walpole Green Limited
57 MWScoping Walpole 400kV Substation
National Grid (England & Wales)
Aug 2025
Willington
Battery storage · Pivoted Power LLP
57 MWScoping Willington East 400kV Substation
National Grid (England & Wales)
Jun 2026
GH DEVCO Gretna Green BESS
Battery storage · Gretna Energy Storage Limited
56 MWScoping Gresham House Gretna 400/132kv Substation
SP Transmission (south Scotland)
Oct 2032
Harestanes West Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
56 MWScoping Harestanes West Wind Farm 132/33kV
SP Transmission (south Scotland)
Sep 2029
Manquhill Wind Farm
Wind + storage · Energyfarm UK Manquhill Ltd
56 MWScoping Manquhill Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Oct 2036
AGS Nerston 2 BESS
Battery storage · Advance Grid Solutions Limited
55 MWScoping East Kilbride B 275/33kV Substation
SP Transmission (south Scotland)
Oct 2033
AGS Nerston 3 BESS
Battery storage · Advance Grid Solutions Limited
55 MWScoping East Kilbride B 275/33kV Substation
SP Transmission (south Scotland)
Oct 2033
Drinkstone Hybrid
Solar + storage · Buccleuch Estates, Ltd. (The)
55 MWScoping Drinkstone Hybrid 132/33kV substation
SP Transmission (south Scotland)
Jul 2035
Rogerton Cottage BESS
Battery storage · Drax BESS Ek Limited
55 MWScoping East Kilbride 275/33kV GSP
SP Transmission (south Scotland)
Mar 2027
Lees Hill Renewable Energy Park
Solar + storage · Fred Olsen Renewables Limited
54 MWScoping Kelloe Mains 400kV Substation
SP Transmission (south Scotland)
Apr 2033
Sclenteuch Energy Park
Wind + storage · Sclenteuch Energy Limited
54 MWScoping Sclenteuch Energy Park 132kV
SP Transmission (south Scotland)
Oct 2029
Ditcher Law
Wind + storage · E Power Limited
53 MWAwaiting Consents Dunlaw Extension 132/33kV
SP Transmission (south Scotland)
Oct 2031
High Brenfield 1
Onshore wind · High Brenfield Wind Farm Limited
53 MWScoping Craig Murrail 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2034
Watten Wind Farm
Onshore wind · Edf Energy Renewables Limited
53 MWScoping Mybster 3 132/33kV Substation
SSEN Transmission (north Scotland)
Jun 2028
Kaimes Energy Park
Battery storage · HP Trotter t/a Printonan Farm
51 MWScoping Kaimes GSP
SP Transmission (south Scotland)
Apr 2027
50MW BESS Connagill
Battery storage · Cerulisia Ltd
50 MWScoping New Connagill 275/132kV Substation
SSEN Transmission (north Scotland)
Oct 2031
AGS Nerston BESS
Battery storage · Advance Grid Solutions Limited
50 MWScoping East Kilbride B 275/33kV Substation
SP Transmission (south Scotland)
Oct 2033
Page 28 of 32

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.