Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Pivot Power Harker Hybrid

Pivot Power Harker Hybrid is a 57 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Harker 400/132KV Substation, with capacity due from October 2029. The connection agreement is held by Pivoted Power LLP.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001065
Customer
Pivoted Power LLP
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
57 MW
Change in this agreement
+57 MW
Capacity effective from
31 October 2029
Connection site
Harker 400/132KV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Harker · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem