Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Exeter Main Tertiary

Exeter Main Tertiary is a 57 MW gas project in planning, connecting to the National Grid (England & Wales) network at Exeter 400kV Substation, with capacity due from May 2024. The connection agreement is held by Exeter Main Battery Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom May 2024 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-000452
Customer
Exeter Main Battery Limited
Technology
Thermal
Total capacity
57 MW
Change in this agreement
+57 MW
Capacity effective from
1 May 2024
Connection site
Exeter 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Exeter Β· Grid map

Other projects at Exeter 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem