Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,590616.3 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,590 projects · page 26 of 32
ProjectCapacityStageConnection siteFrom
Airtnoch BESS
Battery storage · Turbine Marketing Spv Limited
89 MWAwaiting Consents Whitelee Extension 275/33kV
SP Transmission (south Scotland)
Sep 2027
Nant Ceiment Energy Park
Onshore wind · Nant Ceiment Energy Park Limited
88 MWScoping Pont Abraham GSP
National Grid (England & Wales)
Sep 2027
Assel Valley Extension Wind Farm
Wind + storage · Renantis UK Limited
88 MWScoping Maybole GSP
SP Transmission (south Scotland)
Oct 2032
Ceislein Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
86 MWScoping Ceislien Wind Farm
SSEN Transmission (north Scotland)
Oct 2030
Orddu Energy Park
Onshore wind · Orddu Energy Park Limited
86 MWScoping North Wales connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
West Andershaw Wind Farm
Onshore wind · West Andershaw Wind Farm Limited
86 MWScoping West Andershaw 132kV Substation
SP Transmission (south Scotland)
Apr 2030
Carn Fearna Wind Farm
Onshore wind · Carn Fearna Wind Farm Limited
85 MWScoping Carn Fearna Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Jun 2030
Derwydd Bach Energy Park
Solar · Constantine Wind Energy Limited
85 MWScoping Gwyddelwern 400kV Substation
National Grid (England & Wales)
Oct 2037
Acheilidh Wind Farm
Wind + storage · Energyfarm UK Acheilidh Ltd
84 MWScoping Acheilidh Wind farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Beinn Tharsuinn Repower
Onshore wind · Scottish Power Renewables (UK) Limited
84 MWScoping Beinn Thursunn Repower 275/33Kv
SSEN Transmission (north Scotland)
Oct 2029
Carrick Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
84 MWAwaiting Consents Carrick Wind Farm Substation
SP Transmission (south Scotland)
Apr 2030
Hagshaw Repowering Phase 3
Solar + storage · Hagshaw Repowering 2 Ltd
84 MWScoping Hagshaw Repowering Phase 3 132kV
SP Transmission (south Scotland)
Apr 2029
Lynemore Wind Farm
Onshore wind · Galileo Empower UK Limited
84 MWScoping Lynemore Windfarm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2031
Minnygryle Burn Energy Park
Wind + storage · Wind 2 Project 6 Limited
84 MWScoping Minnygryle Burn Energy Park 132kV substation
SP Transmission (south Scotland)
Oct 2036
Sheirdrim Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
84 MWScoping Sheirdrim 132kV Substation
SSEN Transmission (north Scotland)
Apr 2032
Kirkan Wind Farm
Wind + storage · Kirkan Wind Farm Limited
82 MWScoping Corriemoillie 2 400/132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Mwdwl Eithin Energy Park
Onshore wind · Moel Chwa Energy Park Limited
81 MWScoping Gwyddelwern 400kV Substation
National Grid (England & Wales)
Jun 2030
Caorach
Wind + storage · Invenergy Development UK Ltd
81 MWScoping Caorach 132 KV Substation
SSEN Transmission (north Scotland)
Oct 2033
Harestanes West Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
81 MWScoping Harestanes West Wind Farm 132/33kV
SP Transmission (south Scotland)
Jul 2035
Airds Hill Wind Farm
Wind + storage · Onpath Energy Limited
80 MWScoping Airds Hill WindFarm 132kV Substation
SP Transmission (south Scotland)
May 2031
Breezy Hill Wind Farm
Onshore wind · Brockwell Energy Limited
80 MWScoping New Cumnock A 132kV
SP Transmission (south Scotland)
Apr 2028
Chesters
Wind + storage · Queequeg Renewables Ltd
80 MWScoping Teviot 400/132kV Substation
SP Transmission (south Scotland)
Oct 2033
Glenmuir Windfarm
Onshore wind · Brockwell Energy Limited
80 MWScoping Glenmuir Windfarm 132kV Substation
SP Transmission (south Scotland)
Jun 2036
Heathland Wind Farm
Wind + storage · Edf Energy Renewables Limited
80 MWScoping Heathland 132/33kV Substation
SP Transmission (south Scotland)
Sep 2028
Tealing Solar & Storage
Solar + storage · Sirius Ecodev (Tealing) Ltd
80 MWAwaiting Consents Tealing IDNO 132/33kV GSP
SSEN Transmission (north Scotland)
Oct 2028
Upper Beoch Windfarm
Onshore wind · Brockwell Energy Limited
80 MWScoping New Cumnock North 132kV Substation
SP Transmission (south Scotland)
Jul 2036
Weirs Drove
Battery storage · Care Power (Burwell 1) Limited
80 MWScoping Burwell 132kV Substation
National Grid (England & Wales)
Oct 2028
Coille Beith Wind Farm
Onshore wind · Coille Beith Wind Farm Limited
79 MWScoping Oykel Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Creachan Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
79 MWScoping Creachan Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Foel Fach Wind Farm
Wind + storage · Foel Fach Wind Farm Limited
79 MWScoping North Wales connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Grimshader Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
79 MWScoping Grimshader Wind Farm Substation132 KV
SSEN Transmission (north Scotland)
Oct 2033
Kilbraur North Wind Farm
Onshore wind · Edf Energy Renewables Limited
79 MWScoping Kilbraur Wind Farm Substation
SSEN Transmission (north Scotland)
Oct 2031
Olivers Forest Wind Farm
Onshore wind · Oliver Forest Wind Farm Limited
79 MWAwaiting Consents Olivers Forest Wind Farm 132kV Substation
SP Transmission (south Scotland)
Apr 2031
Bankend Rig III Wind Farm
Onshore wind · Wilson Renewables III LLP
78 MWScoping Bankend Rig III 132kV Collector Substation
SP Transmission (south Scotland)
Apr 2030
Necton Greener Grid Park
Battery storage · Necton Grid Solutions Limited
78 MWAwaiting Consents Necton 400kV Substation
National Grid (England & Wales)
Oct 2032
Craighead Wind Farm
Onshore wind · Galileo 02 Limited
77 MWScoping CRAIGHEAD WIND FARM 132kV SUBSTATION
SP Transmission (south Scotland)
Oct 2032
Tarvie Wind Farm
Wind + storage · Koehler Renewable Energy UK Limited
77 MWScoping Beauly substation 275KV
SSEN Transmission (north Scotland)
Oct 2033
Sellindge (Tertiary)
Battery storage · Pivoted Power LLP
76 MWAwaiting Consents Sellindge 400kV Substation
National Grid (England & Wales)
Oct 2031
Abhainn Dubh Wind Farm
Onshore wind · E Power Limited
75 MWScoping Abhainn Dubh Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
May 2029
Chalmerston Windfarm
Onshore wind · Brockwell Energy Limited
75 MWScoping CHALMERSTON WINDFARM 132kV SUBSTATION
SP Transmission (south Scotland)
Oct 2037
Windburn
Wind + storage · Windburn Wind Farm Limited
75 MWScoping Braco West GSP
SSEN Transmission (north Scotland)
Oct 2035
Windburn Wind Farm
Wind + storage · Windburn Wind Farm Limited
75 MWScoping Devonside 132kV Substation
SP Transmission (south Scotland)
Oct 2034
Bryn Gilwern Energy Park
Onshore wind · Bryn Gilwern Energy Park Limited
75 MWScoping Pont Abraham GSP
National Grid (England & Wales)
Oct 2026
Strath Oykel Wind Farm
Wind + storage · Energyfarm Strath Oykel LLP
74 MWAwaiting Consents Shin 1 GSP
SSEN Transmission (north Scotland)
Oct 2032
Arecleoch Extension Windfarm
Onshore wind · Scottish Power Renewables (UK) Limited
73 MWScoping Arecleoch 132/33kV
SP Transmission (south Scotland)
Aug 2026
Craig Watch Wind Farm
Onshore wind · Craig Watch Wind Farm Limited
73 MWAwaiting Consents Craig Watch Wind Farm 132Kv Substation
SSEN Transmission (north Scotland)
May 2031
Killeal
Onshore wind · Abei Energy Limited
73 MWScoping Newton Stewart GSP
SP Transmission (south Scotland)
Oct 2036
Leithenwater Wind Farm
Wind + storage · Leithenwater Wind Energy Hub Limited
73 MWScoping Galashiels 132/33kV
SP Transmission (south Scotland)
Apr 2030
Narachan Wind Farm
Onshore wind · Energyfarm UK Narachan LLP
73 MWScoping Carradale 1 GSP
SSEN Transmission (north Scotland)
Apr 2030
Calon y Gwynt
Solar + storage · Wind 2 Project 3 Limited
72 MWScoping Mid Wales Connection Node A
National Grid (England & Wales)
Oct 2037
Page 26 of 32

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.