NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,590616.3 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,590 projects · page 25 of 32
ProjectCapacityStageConnection siteFrom
KXP Alpha 1 Little Horsted
Battery storage · Kxp Alpha I Limited
100 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
KXP Alpha 2 Little Horsted
Battery storage · Kxp Alpha II Limited
100 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
KXP Alpha 3 Little Horsted
Battery storage · Kxp Alpha III Limited
100 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Mckraw99Mw BESS Bega
Battery storage · Care Power (Muckraw) Limited
100 MWScoping Muckraw IDNO GSP
SP Transmission (south Scotland)
Jun 2032
Norwich 100MW BESS
Battery storage · Flexion Energy Spv 2 Ltd
100 MWScoping Norwich Main 132kV
National Grid (England & Wales)
Oct 2031
Pembroke BESS and Solar Station
Solar + storage · Renesola Hercules Energy 1 Limited
100 MWAwaiting Consents Pembroke 400kV Substation
National Grid (England & Wales)
Oct 2028
Penn Renewable BESS & Substation
Solar + storage · O&G Solar (SPV 30) Limited
100 MWScoping Penn 132kV Substation
National Grid (England & Wales)
Oct 2034
Thurcroft BESS
Battery storage · Harmony Tc Limited
100 MWScoping Thurcroft 275kV Substation
National Grid (England & Wales)
Oct 2031
Valley Farm
Battery storage · Starlight Energy UK Limited
100 MWScoping Bishops Wood GSP
National Grid (England & Wales)
Oct 2037
Breakish Windfarm
Onshore wind · Asuk Holdco 2 Limited
100 MWScoping Breakish 132kV Substation
SSEN Transmission (north Scotland)
Apr 2034
Dollymans Storage
Battery storage · Dollymans Storage Limited
100 MWScoping Rayleigh Main 132kV Substation
National Grid (England & Wales)
Jan 2023
AGS Inverclyde BESS
Battery storage · Slate Island Developments Limited
99 MWScoping Braeside IDNO 132/33kV substation
SP Transmission (south Scotland)
Oct 2031
Blair Hill Wind Farm
Onshore wind · Renewable Energy Systems Limited
99 MWScoping Blair Hill Wind Farm 132Kv Substation
SP Transmission (south Scotland)
Oct 2036
Brunt Hill Wind Farm
Wind + storage · Brunt Hill Limited
99 MWAwaiting Consents Westfield 132/33kV
SSEN Transmission (north Scotland)
Oct 2031
Car Duibh Wind Farm
Onshore wind · Car Duibh Wind Farm Limited
99 MWAwaiting Consents Car Duibh 275kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Elchies Wind Farm
Onshore wind · Elchies Wind Limited
99 MWScoping Elchies 132/33kV Substation
SSEN Transmission (north Scotland)
Nov 2028
Forsinain Wind Farm
Onshore wind · Forsinain Forest Wind Farm Limited
99 MWScoping Connagill 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
KX Alpha 1 Iron Acton
Battery storage · Kxp Alpha I Limited
99 MWScoping Severn Connection Node A 400kv Substation
National Grid (England & Wales)
Oct 2037
KX Alpha 2 Iron Acton
Battery storage · Kxp Alpha II Limited
99 MWScoping Severn Connection Node A 400kv Substation
National Grid (England & Wales)
Oct 2038
Kxp Alpha 3 Ayr BESS
Battery storage · Kxp Alpha III Limited
99 MWScoping KXP Alpha 3 Ayr BESS 275kV Substation
SP Transmission (south Scotland)
Oct 2037
Loch Liath Wind Farm
Onshore wind · Loch Liath Wind Farm Limited
99 MWAwaiting Consents Loch Liath 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2035
Mid Moile Wind Farm
Onshore wind · Energiekontor UK Ltd
99 MWScoping Mid Moile Wind Farm 275/132kV Substatio
SP Transmission (south Scotland)
Oct 2031
Quintfall Forest Hybrid Wind and BESS 1
Wind + storage · Voltalia UK Ltd
99 MWScoping Gills Bay 132kV
SSEN Transmission (north Scotland)
Oct 2037
Swansea Greener Grid Park - Connection 1
Battery storage · Swansea Grid Solutions Limited
97 MWScoping Swansea North 400kV Substation
National Grid (England & Wales)
Oct 2028
Ballygroggan Wind Farm
Onshore wind · Dalriada Renewables Limited
96 MWScoping Ballygroggan 132/33Kv Substation
SSEN Transmission (north Scotland)
Oct 2034
Daer Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
96 MWAwaiting Consents Daer Wind Farm 132/33kV
SP Transmission (south Scotland)
Aug 2028
Tangy IV WF
Onshore wind · SSE Renewables Services (UK) Limited
96 MWScoping Tangy IV 132KV Substation
SSEN Transmission (north Scotland)
Apr 2029
Glenvernoch
Wind + storage · Energyfarm UK Glenvernoch Ltd
96 MWScoping Glenvernoch 132kV
SP Transmission (south Scotland)
Oct 2037
17 Acres and BESS
Battery storage · Aeuk Battery Project II Ltd
96 MWScoping 17 Acres BESS 275Kv Substation
SSEN Transmission (north Scotland)
Jun 2032
Pitcox BESS
Battery storage · Abei Energy Limited
96 MWScoping Dunbar 132/33kV
SP Transmission (south Scotland)
Jul 2032
Erebus
Offshore wind · Blue Gem Wind Limited
95 MWScoping Pembroke 132kV Substation
National Grid (England & Wales)
Jul 2028
Beinn an Tuirc 1
Onshore wind · Scottish Power Renewables (UK) Limited
95 MWScoping Beinn an Tuirc Substation
SSEN Transmission (north Scotland)
Oct 2034
Braegrundie Farm
Battery storage · Aeuk Battery Project III Ltd
95 MWAwaiting Consents Braegrundie Farm 132kV Substation
SSEN Transmission (north Scotland)
Jun 2030
Llanwern 3
Solar + storage · Future Energy Llanwern Limited
95 MWScoping South Wales East Connection Node A 275kV Substation
National Grid (England & Wales)
Oct 2037
Llanwern Phase 1
Solar + storage · Future Energy Llanwern Limited
95 MWAwaiting Consents Whitson 275kV Substation
National Grid (England & Wales)
Oct 2028
Quantans Hill Wind Farm
Onshore wind · Vattenfall Wind Power Ltd
95 MWScoping Quantans Hill 132kV Substation
SP Transmission (south Scotland)
Jul 2029
Millmoor Rig Wind Farm
Onshore wind · Esb Asset Development UK Limited
93 MWScoping Hawick GSP
SP Transmission (south Scotland)
Oct 2029
012 NEP Coventry West
Battery storage · New Energy Partnership Limited
92 MWScoping Berkswell GSP
National Grid (England & Wales)
Oct 2034
Craiginmoddie Wind Farm
Onshore wind · Energyfarm UK Craiginmoddie LLP
92 MWScoping Maybole 132/33kV
SP Transmission (south Scotland)
Sep 2031
Pollie Hill Wind Farm
Onshore wind · Pollie Hill Wind Farm Limited
92 MWScoping Pollie Hill Wind Farm 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2031
South Kyle 2 Wind farm
Wind + storage · Vattenfall Wind Power Ltd
92 MWScoping South Kyle 2 132/33kV Substation
SP Transmission (south Scotland)
Jul 2030
Kyllachy Wind Farm
Wind + storage · Wind Estate (UK) Limited
91 MWScoping Tomatin 132kV Substation Extension
SSEN Transmission (north Scotland)
Oct 2037
Breackerie wind farm
Wind + storage · Energyfarm UK Breackerie Ltd
91 MWScoping Breackerie 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Rowan Wind Energyfarm
Wind + storage · Energyfarm Rowan LLP
91 MWScoping Rowan 275/33kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Edinbane Windfarm
Wind + storage · Vattenfall Wind Power Ltd
90 MWScoping Edinbane 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2033
Fairburn Extension Wind Farm
Onshore wind · SSE Renewables Services (UK) Limited
90 MWScoping Fairburn Extension 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2031
Kellas Wind Farm
Onshore wind · E Power Limited
90 MWScoping Kellas Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Laleham
Battery storage · Juniper Energy Limited
90 MWScoping Laleham 132kV Substation
National Grid (England & Wales)
Oct 2030
Seat Hill Wind Farm
Wind + storage · Perigus Energy UK Limited
90 MWScoping Seat Hill 132kV Substation
SP Transmission (south Scotland)
Oct 2035
Woodcock Hill Wind Farm
Wind + storage · Perigus Energy UK Limited
90 MWScoping Woodcock Hill WF Substation
SSEN Transmission (north Scotland)
Oct 2032
Page 25 of 32

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.