🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 16 of 46
ProjectCapacityStageConnection siteFrom
Elmya Bathgate BESS
Battery storage · Rpc Elmya Carnation Bathgate Limited
300 MWScoping Armadale 400kv Substation
SP Transmission (south Scotland)
Oct 2031
Elmya Grange Road
Solar + storage · Elmya Rpc UK Grange Road Limited
300 MWAwaiting Consents Elmya Grange 400kV
National Grid (England & Wales)
Oct 2031
Elmya Melbourne BESS
Battery storage · Elmya Rpc UK Melbourne Limited
300 MWScoping Thornton 400kV Substation
National Grid (England & Wales)
Oct 2039
Elmya Rednal
Battery storage · Elmya Rpc UK Rednal Limited
300 MWAwaiting Consents Ironbridge 400kV Substation
National Grid (England & Wales)
Oct 2034
Fiddlers Ferry BESS
Battery storage · Fiddlers Ferry Ltd
300 MWConsents Approved Fiddlers Ferry 275kV Substation
National Grid (England & Wales)
Oct 2027
Gf Sellindge BESS
Battery storage · GF Sellindge Energy Ltd
300 MWScoping East Kent connection node A 400kV Substation
National Grid (England & Wales)
Oct 2036
Grangemouth Hybrid BESS & Solar PV
Solar + storage · Tagenergy Development UK Limited
300 MWScoping Letham 400/275kV substation
SP Transmission (south Scotland)
Jun 2032
Great Coates BESS
Battery storage · Bruton One BESS Limited
300 MWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
Oct 2035
Green Volt Offshore Windfarm
Offshore wind · Green Volt Offshore Windfarm Ltd
300 MWScoping New Deer 400kV Substation
SSEN Transmission (north Scotland)
Mar 2029
Gresham House Dalmarnock BESS
Battery storage · Energyhubdevelopments Limited
300 MWScoping Gresham House Dalmarnock Bess 132kv Substation
SP Transmission (south Scotland)
Apr 2030
Gresham House Kincardine BESS
Battery storage · Flavusia Ltd
300 MWScoping Gresham House Kincardine BESS 275/132kV substation
SP Transmission (south Scotland)
Oct 2029
Gwynt Glas Offshore Wind Farm
Offshore wind · Gwynt Glas Offshore Wind Farm Limited
300 MWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Oct 2031
Kynachan
Battery storage · Geocore Ltd
300 MWScoping Kynachan BESS 132kV Substation
SSEN Transmission (north Scotland)
Oct 2035
Langage 400
Solar + storage · Enso Green Holdings X Limited
300 MWScoping Langage 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Bodelwyddan
Battery storage · Lightsource Renewable UK Development Limited
300 MWScoping Cheshire Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Pyworthy
Battery storage · Lightsource Renewable UK Development Limited
300 MWScoping West Country Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Rhigos BESS
Battery storage · Lightsource Renewable UK Development Limited
300 MWScoping South Wales West Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Littlebrook BESS
Battery storage · Ecodev (South) Ltd
300 MWScoping Littlebrook 132kV Substation
National Grid (England & Wales)
Oct 2027
Llywelyn Floating Offshore Wind Farm
Offshore wind · Renantis UK Limited
300 MWScoping Pembroke 400kV Substation
National Grid (England & Wales)
Mar 2029
Loch Fearna Pumped Storage
Hydro and pumped storage · Fearna Psh Limited
300 MWAwaiting Consents Loch Fearna Pumped Storage 400/18kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Longmorn Energy Park
Solar + storage · Elgin Energy Es Co Limited
300 MWScoping Longmorn Energy Park 275kV Substation
SSEN Transmission (north Scotland)
Aug 2031
Merlin Offshore Wind Farm
Offshore wind · Offshore Wind Limited
300 MWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Oct 2031
Morwind 300
Offshore wind · Morwind Ltd
300 MWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Oct 2031
Newarthill Energy Park
Battery storage · Dalzell (Newarthill) Ltd
300 MWScoping Newarthill Energy Park 275kV Substation
SP Transmission (south Scotland)
Oct 2029
NorthFleet 2 BESS
Battery storage · Cse41 Limited
300 MWScoping NorthFleet 400kV Substation
National Grid (England & Wales)
Oct 2028
Overton Grange BESS
Battery storage · Anesco Limited
300 MWScoping Wearside Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2035
Petroc Offshore Wind Farm
Offshore wind · Bluefloat Energy UK Holdings Limited
300 MWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Mar 2029
Rattray BESS and Solar Plant
Solar + storage · Greentech Projects Holding UK Limited
300 MWScoping New North East Substation 400kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Red Moss Farm
Battery storage · Qair Renewables UK Limited
300 MWScoping Red Moss Farm 132kV Substation
SP Transmission (south Scotland)
May 2031
Redhall BESS
Battery storage · Anesco Limited
300 MWScoping Wearside Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2035
Spittal BESS
Battery storage · Field Spittal Ltd
300 MWScoping Spittal 132kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Stirling BESS
Battery storage · Anesco Limited
300 MWScoping Peterhead 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Stoke Bardolph 400
Solar + storage · Enso Green Holdings Limited
300 MWScoping Stoke Bardolph 400kV Substation
National Grid (England & Wales)
Oct 2031
Strathaven BESS
Battery storage · Igp Energy Storage 2 Limited
300 MWScoping Strathaven 400kV Substation
SP Transmission (south Scotland)
Oct 2033
Swainsthorpe
Solar + storage · Lightsource Renewable UK Development Limited
300 MWScoping North Anglia Connection Node A 400kV
National Grid (England & Wales)
Oct 2037
Thanet Offshore Wind Farm
Offshore wind · Thanet Offshore Wind Limited
300 MWBuilt Thanet 33/132kV Offshore Substation
Offshore transmission owner
Thorney Edge
Battery storage · ARL Energy Development Limited
300 MWScoping Cellarhead 400kV Substation
National Grid (England & Wales)
Nov 2037
Thurrock Power Station
Battery storage · Thurrock Flexible Generation Limited
300 MWBuilt Tilbury 275kV Substation
National Grid (England & Wales)
Valorous Offshore Wind Farm
Offshore wind · Blue Gem Wind Limited
300 MWScoping Pembroke 400kV Substation
National Grid (England & Wales)
Oct 2031
Waltham Cross BESS
Battery storage · Shaw-Energi Ltd
300 MWScoping London North East Connection Node A 400kV
National Grid (England & Wales)
Oct 2033
Whiteleigh Farm
Solar + storage · Qair Renewables UK Limited
300 MWScoping Pyworthy 400kV Substation
National Grid (England & Wales)
Dec 2036
Zenobe Blackhillock 300 MW
Battery storage · Zenobe Blackhillock Limited
300 MWConsents Approved Blackhillock 275kV Substation
SSEN Transmission (north Scotland)
Apr 2026
Zenobe Hartmoor BESS
Battery storage · Zenobe Energy Limited
300 MWScoping Wearside Connection Node A 275kV Substation
National Grid (England & Wales)
Oct 2035
Zenobe Hawthorn Pit BESS
Battery storage · Zenobe Energy Limited
300 MWScoping Wearside Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Zenobe Kilmarnock South
Battery storage · Zenobe Kilmarnock South Limited
300 MWBuilt Kilmarnock South 400kV Substation
SP Transmission (south Scotland)
Zenobe Little Horsted BESS
Battery storage · Zenobe Energy Limited
300 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Zenobe Necton BESS
Battery storage · Zenobe Energy Limited
300 MWScoping Necton 400kV Substation
National Grid (England & Wales)
Oct 2034
Zenobe Spennymoor BESS
Battery storage · Zenobe Energy Limited
300 MWScoping Wearside Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2035
Zenobe Yaxley BESS
Battery storage · Zenobe Energy Limited
300 MWScoping North Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Spalding Energy Expansion
Battery storage · Spalding Energy Expansion Limited
300 MWBuilt Spalding North 400kV Substation
National Grid (England & Wales)
Page 16 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.