Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Elmya Rednal

Elmya Rednal is a 300 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Ironbridge 400kV Substation, with capacity due from October 2034. The connection agreement is held by Elmya Rpc UK Rednal Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2034 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002526
Customer
Elmya Rpc UK Rednal Limited
Technology
Energy Storage System
Total capacity
300 MW
Change in this agreement
+300 MW
Capacity effective from
30 October 2034
Connection site
Ironbridge 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Awaiting Consents
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Ironbridge Β· Grid map

Other projects at Ironbridge 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem