Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Thorney Edge

Thorney Edge is a 300 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Cellarhead 400kV Substation, with capacity due from November 2037. The connection agreement is held by ARL Energy Development Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Nov 2037 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002327
Customer
ARL Energy Development Limited
Technology
Energy Storage System
Total capacity
300 MW
Change in this agreement
+300 MW
Capacity effective from
30 November 2037
Connection site
Cellarhead 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Cellarhead Β· Grid map

Other projects at Cellarhead 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem