Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

Littlebrook BESS

Littlebrook BESS is a 300 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Littlebrook 132kV Substation, with capacity due from October 2027. The connection agreement is held by Ecodev (South) Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2027 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001832
Customer
Ecodev (South) Ltd
Technology
Energy Storage System
Total capacity
300 MW
Change in this agreement
+300 MW
Capacity effective from
15 October 2027
Connection site
Littlebrook 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Littlebrook · Grid map

Other projects at Littlebrook 132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem