Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown29358.6 GW
Active in queue58.6 GW293 requests
Agreement signed23.9 GW116 requests
Withdrawn8117.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

293 requests · page 1 of 6
ProjectCapacityStatusLocationRegionQueuedOnline
Southeast Oklahoma Pumped Storage
Other · Apex Energy Solutions, LLC
1,232 MWIn study Lamar, TXERCOT Aug 2022target 2030
Shadow Ranch Solar
Solar · LectricWind LLC
808 MWIn study Upton, TXERCOT Sep 2022target 2026
Meitner Solar
Solar · IP Meitner, LLC
703 MWAgreement signed Gray, TXERCOT Aug 2022target 2027
Short Creek Solar
Solar + storage · Wichita Solar I, LLC
628 MWAgreement signed Wichita, TXERCOT Jan 2022target 2027
Tempesta BESS
Battery storage
600 MWPaused / redesign Kaufman, TXERCOT Jun 2022
Capoterra BESS
Battery storage
600 MWPaused / redesign Milam, TXERCOT Jun 2022
Capoterra
Solar
598 MWPaused / redesign Milam, TXERCOT Jun 2022
Brittlebush BESS
Battery storage
597 MWPaused / redesign Henderson, TXERCOT Jun 2022
Brittlebush Solar
Solar
594 MWPaused / redesign Henderson, TXERCOT Jun 2022
Point Mountain Solar
Solar
514 MWPaused / redesign Upton, TXERCOT Jul 2022target 2026
Gas project GEN-2022-GR1, Harrison County
Gas
513 MWAgreement signed Harrison, TXSPP Mar 2022target 2027
Midnight Sun Energy Storage
Battery storage · Midnight Sun Energy Storage, LLC
510 MWAgreement signed Crockett, TXERCOT Dec 2022target 2028
Tres Rios Ranch Solar
Solar + storage · LectricWind LLC
508 MWIn study Upton, TXERCOT Aug 2022target 2027
Bayside BESS
Battery storage
508 MWPaused / redesign Victoria, TXERCOT Mar 2022
Hiru Storage
Solar + storage · Hecate Energy Hazel LLC
504 MWIn study Clay, TXERCOT Nov 2022target 2029
Austin Bayou Solar
Solar + storage · Austin Bayou Solar, LLC
503 MWAgreement signed Brazoria, TXERCOT Jun 2022target 2027
Hollow Branch Creek Storage
Solar + storage · Hollow Branch Creek Solar LLC
460 MWIn study Leon, TXERCOT Sep 2022target 2027
Hollow Branch Creek Solar
Solar + storage · Hollow Branch Creek Solar LLC
460 MWAgreement signed Leon, TXERCOT Sep 2022target 2027
NRG THW GT 345 (Tef)
Gas · NRG THW GT LLC
456 MWAgreement signed Harris, TXERCOT Nov 2022target 2026
Soleil Solar
Solar · Soleil Solar, LLC
452 MWAgreement signed Clay, TXERCOT Sep 2022target 2028
Zeissel Solar
Solar · ZSS Power, LLC
452 MWAgreement signed Knox, TXERCOT Feb 2022target 2028
NRG Greens Bayou 6 (TEF-Due Diligence)
Gas · NRG Greens Bayou 6 LLC
445 MWAgreement signed Harris, TXERCOT Aug 2022target 2028
Tempesta
Solar
443 MWPaused / redesign Kaufman, TXERCOT Jun 2022
Smith Lake Solar DC
Solar + storage · Smith Lake Solar
402 MWIn study Grimes, TXERCOT Feb 2022target 2028
Bottom Grass Solar II
Solar + storage · Flint Rock Solar Project, LLC
402 MWIn study Colorado, TXERCOT Nov 2022target 2028
Bug Tussle Wind Project
Onshore wind · Bug Tussle Wind, LLC
397 MWAgreement signed Lamar, TXERCOT Jan 2022target 2027
Earthwise Solar
Solar · Quanah Solar 2
371 MWIn study Hardeman, TXERCOT Mar 2022target 2026
Sombrero Solar
Solar · Aurora Solar LLC
352 MWIn study Schleicher, TXERCOT Mar 2022target 2028
Rowdy Creek Solar
Solar + storage · Rowdy Creek Solar LLC
352 MWAgreement signed Lamar, TXERCOT Jan 2022target 2027
HyFuels Green Lake Solar
Solar · HyFuels Green Lake Solar LLC
347 MWIn study Victoria, TXERCOT Sep 2022target 2027
Elio BESS
Battery storage · Elio Energy LLC
317 MWAgreement signed Brazoria, TXERCOT Jul 2022target 2027
Middlebrook Solar Limited Liability Company
Solar + storage · Middlebrook Solar LLC
316 MWAgreement signed Nacogdoches, TXERCOT Oct 2022target 2027
Royal River BESS
Battery storage · Royal River LLC
311 MWIn study Brazoria, TXERCOT Mar 2022target 2027
Red Egret BESS
Battery storage · Red Egret LLC
311 MWAgreement signed Galveston, TXERCOT Mar 2022target 2026
Argenta Solar
Solar + storage · Charter Oak Solar, LLC
310 MWAgreement signed Bee, TXERCOT Jun 2022target 2028
Two Forks BESS
Battery storage · Two Forks LLC
310 MWAgreement signed Cooke, TXERCOT Jan 2022target 2027
SanPat Solar I
Solar · Padre Solar LLC
309 MWAgreement signed San Patricio, TXERCOT Jul 2022target 2027
Blue Skies BESS
Battery storage · ACTX BESS Project LLC
306 MWAgreement signed Hill, TXERCOT May 2022target 2027
Glory Bee Solar
Solar + storage · Riley Solar LLC
305 MWIn study Erath, TXERCOT Jun 2022target 2026
Lake Henry Wind
Onshore wind
305 MWPaused / redesign Kent, TXERCOT Sep 2022target 2027
Academy Wind
Onshore wind
305 MWPaused / redesign Dickens, TXERCOT Sep 2022target 2028
Furay Battery Energy Storage System
Battery storage · Blue Topaz 1, LLC
304 MWIn study Harris, TXERCOT Sep 2022target 2027
HyFuels Calhoun Solar
Solar · HyFuels Green Lake Solar LLC
302 MWIn study Victoria, TXERCOT Oct 2022target 2027
Triangle Ranch Alpha
Onshore wind · Triangle Ranch Wind
302 MWIn study Cottle, TXERCOT Oct 2022target 2029
Great Rock BESS
Battery storage · Black Mountain Energy Storage II
301 MWAgreement signed Leon, TXERCOT Nov 2022target 2027
Photo Solar 2
Solar + storage · CED Development Inc.
300 MWIn study Uvalde, TXERCOT Sep 2022target 2027
Solar project J3045, Orange County
Solar
300 MWIn study Orange, TXMISO Sep 2022target 2026
Camino Ranch Storage SLF
Solar + storage · Camino Solar Ranch, LLC
298 MWIn study Houston, TXERCOT Oct 2022target 2028
Camino Ranch Solar SLF
Solar + storage · Camino Ranch Solar Project LLC
296 MWIn study Houston, TXERCOT Oct 2022target 2028
Piedra Solar
Solar + storage · Piedra Solar, LLC
282 MWAgreement signed Freestone, TXERCOT Sep 2022target 2026
Page 1 of 6

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)