| Project | Capacity | Status |
|---|---|---|
| Southeast Oklahoma Pumped Storage Other · Apex Energy Solutions, LLC |
1,232 MW | In study |
| Shadow Ranch Solar Solar · LectricWind LLC |
808 MW | In study |
| Meitner Solar Solar · IP Meitner, LLC |
703 MW | Agreement signed |
| Short Creek Solar Solar + storage · Wichita Solar I, LLC |
628 MW | Agreement signed |
| Tempesta BESS Battery storage |
600 MW | Paused / redesign |
| Capoterra BESS Battery storage |
600 MW | Paused / redesign |
| Capoterra Solar |
598 MW | Paused / redesign |
| Brittlebush BESS Battery storage |
597 MW | Paused / redesign |
| Brittlebush Solar Solar |
594 MW | Paused / redesign |
| Point Mountain Solar Solar |
514 MW | Paused / redesign |
| Gas project GEN-2022-GR1, Harrison County Gas |
513 MW | Agreement signed |
| Midnight Sun Energy Storage Battery storage · Midnight Sun Energy Storage, LLC |
510 MW | Agreement signed |
| Tres Rios Ranch Solar Solar + storage · LectricWind LLC |
508 MW | In study |
| Bayside BESS Battery storage |
508 MW | Paused / redesign |
| Hiru Storage Solar + storage · Hecate Energy Hazel LLC |
504 MW | In study |
| Austin Bayou Solar Solar + storage · Austin Bayou Solar, LLC |
503 MW | Agreement signed |
| Hollow Branch Creek Storage Solar + storage · Hollow Branch Creek Solar LLC |
460 MW | In study |
| Hollow Branch Creek Solar Solar + storage · Hollow Branch Creek Solar LLC |
460 MW | Agreement signed |
| NRG THW GT 345 (Tef) Gas · NRG THW GT LLC |
456 MW | Agreement signed |
| Soleil Solar Solar · Soleil Solar, LLC |
452 MW | Agreement signed |
| Zeissel Solar Solar · ZSS Power, LLC |
452 MW | Agreement signed |
| NRG Greens Bayou 6 (TEF-Due Diligence) Gas · NRG Greens Bayou 6 LLC |
445 MW | Agreement signed |
| Tempesta Solar |
443 MW | Paused / redesign |
| Smith Lake Solar DC Solar + storage · Smith Lake Solar |
402 MW | In study |
| Bottom Grass Solar II Solar + storage · Flint Rock Solar Project, LLC |
402 MW | In study |
| Bug Tussle Wind Project Onshore wind · Bug Tussle Wind, LLC |
397 MW | Agreement signed |
| Earthwise Solar Solar · Quanah Solar 2 |
371 MW | In study |
| Sombrero Solar Solar · Aurora Solar LLC |
352 MW | In study |
| Rowdy Creek Solar Solar + storage · Rowdy Creek Solar LLC |
352 MW | Agreement signed |
| HyFuels Green Lake Solar Solar · HyFuels Green Lake Solar LLC |
347 MW | In study |
| Elio BESS Battery storage · Elio Energy LLC |
317 MW | Agreement signed |
| Middlebrook Solar Limited Liability Company Solar + storage · Middlebrook Solar LLC |
316 MW | Agreement signed |
| Royal River BESS Battery storage · Royal River LLC |
311 MW | In study |
| Red Egret BESS Battery storage · Red Egret LLC |
311 MW | Agreement signed |
| Argenta Solar Solar + storage · Charter Oak Solar, LLC |
310 MW | Agreement signed |
| Two Forks BESS Battery storage · Two Forks LLC |
310 MW | Agreement signed |
| SanPat Solar I Solar · Padre Solar LLC |
309 MW | Agreement signed |
| Blue Skies BESS Battery storage · ACTX BESS Project LLC |
306 MW | Agreement signed |
| Glory Bee Solar Solar + storage · Riley Solar LLC |
305 MW | In study |
| Lake Henry Wind Onshore wind |
305 MW | Paused / redesign |
| Academy Wind Onshore wind |
305 MW | Paused / redesign |
| Furay Battery Energy Storage System Battery storage · Blue Topaz 1, LLC |
304 MW | In study |
| HyFuels Calhoun Solar Solar · HyFuels Green Lake Solar LLC |
302 MW | In study |
| Triangle Ranch Alpha Onshore wind · Triangle Ranch Wind |
302 MW | In study |
| Great Rock BESS Battery storage · Black Mountain Energy Storage II |
301 MW | Agreement signed |
| Photo Solar 2 Solar + storage · CED Development Inc. |
300 MW | In study |
| Solar project J3045, Orange County Solar |
300 MW | In study |
| Camino Ranch Storage SLF Solar + storage · Camino Solar Ranch, LLC |
298 MW | In study |
| Camino Ranch Solar SLF Solar + storage · Camino Ranch Solar Project LLC |
296 MW | In study |
| Piedra Solar Solar + storage · Piedra Solar, LLC |
282 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)283 · 56.6 GW
- MISO (Midcontinent)6 · 1,095 MW
- SPP (Southwest Power Pool)2 · 693 MW
- West (non-ISO utilities)2 · 150 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)