United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Texas (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown11528.9 GW
Active in queue28.9 GW115 requests
Agreement signed14.9 GW54 requests
Withdrawn558,621 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

115 requests · page 1 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
BasRanch (TEF - Due Diligence)
Gas · CPV Basin Ranch, LLC
1,350 MWAgreement signed Ward, TXERCOT Aug 2020target 2028
Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1
Gas
1,166 MWIn study Orange, TXMISO Aug 2020target 2026
Cedar Bayou 5 (TEF - Due Diligence)
Gas · NRG Cedar Bayou 5 LLC
697 MWAgreement signed Chambers, TXERCOT Mar 2020target 2027
Pinnington Solar
Solar + storage · Hecate Energy Longhorn Solar LLC
654 MWAgreement signed Jack, TXERCOT Dec 2020target 2026
Skylab Solar
Solar · EDF Renewables Development, Inc.
610 MWIn study Wharton, TXERCOT Jun 2020target 2025
Cachena Solar SLF
Solar + storage · Clear Fork Creek Solar LLC
601 MWAgreement signed Wilson, TXERCOT May 2020target 2027
Old Aqueduct Solar
Solar + storage · Old Aqueduct Solar
512 MWIn study Hale, TXERCOT Dec 2020target 2028
Bottom Grass Solar
Solar + storage · Bottom Grass Solar Project, LLC
509 MWAgreement signed Colorado, TXERCOT Nov 2020target 2028
Tabor Solar
Solar · Quanah Solar LLC
506 MWIn study Hardeman, TXERCOT Sep 2020target 2027
Frye Storage
Solar + storage · Hecate Energy Frye Storage LLC
504 MWIn study Swisher, TXERCOT Sep 2020target 2026
Pinnington Storage
Solar + storage · Hecate Energy Longhorn Storage LLC
503 MWIn study Jack, TXERCOT Dec 2020target 2029
Duffy Solar
Solar + storage · VDA Solar Texas 1 LLC
503 MWAgreement signed Matagorda, TXERCOT Sep 2020target 2027
Baker Branch Solar
Solar · Mockingbird Solar Center, LLC
469 MWAgreement signed Lamar, TXERCOT Mar 2020target 2026
Sequoia II Solar
Solar · Deville Solar LLC
418 MWAgreement signed Callahan, TXERCOT Jan 2020target 2026
Dragan Storage
Solar + storage · Hecate Grid Dragan Storage LLC
408 MWIn study Comanche, TXERCOT Aug 2020target 2026
Caliche Mound Solar
Solar · Tierra Blanco Solar LLC
407 MWAgreement signed Deaf Smith, TXERCOT Jul 2020target 2026
Dorado Solar
Solar · Enbridge Solar (Sequoia I), LLC
401 MWAgreement signed Callahan, TXERCOT Jan 2020target 2026
Hanson Solar
Solar · Hanson Solar, LLC
399 MWAgreement signed Coleman, TXERCOT Oct 2020target 2027
Charger Solar
Solar · AP Solar 4, LLC
397 MWAgreement signed Refugio, TXERCOT Jun 2020target 2026
Tormes Solar
Solar · BDPU SOLAR TORMES LLC
357 MWAgreement signed Navarro, TXERCOT Oct 2020target 2027
Onshore wind project GEN-2020-067, Terry County
Onshore wind
353 MWIn study Terry, TXSPP Apr 2020target 2026
Chillingham Solar
Solar · Chillingham Solar LLC
352 MWAgreement signed Bell, TXERCOT Aug 2020target 2026
Briggs Solar
Solar + storage · IP Quantum III, LLC
324 MWAgreement signed Haskell, TXERCOT Aug 2020target 2028
Solace Solar
Solar + storage · IP QUANTUM, LLC.
322 MWAgreement signed Haskell, TXERCOT Apr 2020target 2026
Mensa BESS
Battery storage · BRP Mensa BESS LLC
307 MWIn study Pecos, TXERCOT Jun 2020target 2027
Cantaloupe Solar
Solar · Saragosa Del Sol Energy, LLC
307 MWAgreement signed Reeves, TXERCOT Dec 2020target 2028
Old Aqueduct Batt
Solar + storage · Old Aqueduct LLC
303 MWIn study Hale, TXERCOT May 2020target 2028
Brantley Branch Batt
Battery storage · Brantley Branch LLC
302 MWIn study Rusk, TXERCOT May 2020target 2029
BRP Passu BESS
Battery storage · BRP Passu BESS LLC
302 MWIn study Wilbarger, TXERCOT Dec 2020target 2028
Crater BESS
Battery storage · BRP Crater BESS LLC
302 MWIn study Howard, TXERCOT May 2020target 2028
Quela BESS
Battery storage · BRP Quela BESS LLC
301 MWIn study Bexar, TXERCOT Sep 2020target 2027
Seine BESS
Battery storage · BRP Seine BESS LLC
301 MWAgreement signed Foard, TXERCOT Dec 2020target 2027
Solar project GEN-2020-054, Bowie County
Solar
298 MWAgreement signed Bowie, TXSPP Apr 2020target 2027
Fortuna Wind
Onshore wind · RWE Renewables Development, LLC
295 MWAgreement signed Jack, TXERCOT Mar 2020target 2026
Sandow Solar
Solar · Sandow Lakes Ranch Solar I, LLC
287 MWIn study Milam, TXERCOT Sep 2020target 2028
Alila Solar
Solar + storage · Electra Energy Project, LLC
257 MWAgreement signed San Patricio, TXERCOT Oct 2020target 2028
Sierra Madre Solar
Solar · Sierra Madre Solar LLC
255 MWIn study Zapata, TXERCOT Jan 2020target 2027
Pandora Solar
Solar
252 MWPaused / redesign Wilson, TXERCOT Jan 2020
Eval Storage
Battery storage · Hecate Grid East Valley Storage LLC
252 MWAgreement signed Cameron, TXERCOT Oct 2020target 2028
Cantaloupe Storage
Battery storage
251 MWPaused / redesign Reeves, TXERCOT Dec 2020
Tanglewood Solar
Solar · Brazoria Solar, LLC
251 MWAgreement signed Brazoria, TXERCOT Jul 2020target 2026
Samson Solar 3
Solar · Samson Solar Energy III LLC
250 MWAgreement signed Lamar, TXERCOT Jan 2020target 2026
Iguala Solar
Solar
250 MWPaused / redesign Victoria, TXERCOT Oct 2020target 2025
Lavaca Bay Solar
Solar · Lavaca Bay Solar Project, LLC
244 MWAgreement signed Matagorda, TXERCOT Sep 2020target 2026
Razorbill Solar
Solar + storage · RWE Solar Development, LLC
240 MWIn study Matagorda, TXERCOT Jan 2020target 2027
Pluto Solar
Solar
228 MWPaused / redesign Webb, TXERCOT Jun 2020target 2028
Maratua Solar
Solar · BDPU Solar Maratua, LLC
217 MWPaused / redesign Grimes, TXERCOT Dec 2020target 2029
Alamosa Solar
Solar
210 MWPaused / redesign Wilbarger, TXERCOT Dec 2020target 2025
Val Vista Grid BESS 1
Battery storage · Val Vista Grid, LLC
209 MWIn study Hidalgo, TXERCOT Aug 2020target 2028
BRP Rhine BESS
Battery storage · BRP Rhine BESS LLC
207 MWIn study Ward, TXERCOT Aug 2020target 2028
Page 1 of 3

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)