United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2012 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Brownsville G Gas Β· Tenaska |
871 MW | Withdrawn / abandoned |
| Pinecrest G Gas Β· Coronado Ventures |
785 MW | Withdrawn / abandoned |
| LaPaloma G Gas Β· Coronado Ventures |
730 MW | Withdrawn / abandoned |
| Indeck Wharton Gas Β· Indeck |
654 MW | Withdrawn / abandoned |
| SPC Henderson Option 2 Gas Β· Southern Power Company |
478 MW | Withdrawn / abandoned |
| Guadalupe II Gas Β· Calpine |
362 MW | Withdrawn / abandoned |
| Panhandle Wind Onshore wind Β· Pattern Panhandle Wind, LLC |
322 MW | Withdrawn / abandoned |
| Route66 Wind Onshore wind Β· Route 66 LLC |
300 MW | Withdrawn / abandoned |
| Windwood Wind Onshore wind Β· Lincoln Clean |
300 MW | Withdrawn / abandoned |
| Panhandle Wind 3 Onshore wind Β· PATTERN PANHANDLE WIND 3 LLC |
248 MW | Withdrawn / abandoned |
| Smart Wind Ranch Onshore wind Β· Spinning Star Energy LLC |
230 MW | Withdrawn / abandoned |
| Tumbleweed Wind Farm Onshore wind Β· Tumbleweed Wind Farm, LLC |
201 MW | Withdrawn / abandoned |
| LHORN (Longhorn South W) Onshore wind Β· EDF Renewables |
160 MW | Withdrawn / abandoned |
| Freestone Chillers Gas Β· Calpine |
160 MW | Withdrawn / abandoned |
| Longhorn South Onshore wind Β· EDF Renewable Energy |
160 MW | Withdrawn / abandoned |
| Fluvanna Renewable 2 Onshore wind Β· Terna Energy |
152 MW | Withdrawn / abandoned |
| RE Ft Stockton Solar Solar Β· Recurrent Energy |
140 MW | Withdrawn / abandoned |
| SSE phase 1 Onshore wind Β· Spinning Star Energy LLC |
112 MW | Withdrawn / abandoned |
| Hidalgo Chillers Gas Β· Calpine |
95.0 MW | Withdrawn / abandoned |
| Magic Valley Chillers Gas Β· Calpine |
79.0 MW | Withdrawn / abandoned |
| TX_Marfa_Solar Solar Β· Lincoln Renewable Energy, LLC |
75.0 MW | Withdrawn / abandoned |
| Solar Prime TX-2 Solar Β· Solar Prime LLC |
42.0 MW | Withdrawn / abandoned |
| Alpine 1 Solar Solar Β· First Solar |
30.0 MW | Withdrawn / abandoned |
| T2 EF Cogen (Silver Oak Processing) Gas Β· T2 EF Cogeneration, LLC |
25.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)111 Β· 19.3 GW
- CAISO (California)60 Β· 12.3 GW
- West (non-ISO utilities)95 Β· 9,460 MW
- Southeast (non-ISO utilities)36 Β· 9,047 MW
- ERCOT (Texas)24 Β· 6,711 MW
- MISO (Midcontinent)21 Β· 6,395 MW
- SPP (Southwest Power Pool)30 Β· 4,307 MW
- NYISO (New York)10 Β· 1,963 MW
- ISO-NE (New England)10 Β· 996 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)