United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in ERCOT (Texas) (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown246,711 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn246,711 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

24 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Brownsville G
Gas Β· Tenaska
871 MWWithdrawn / abandoned ERCOT Jul 2012target 2020
Pinecrest G
Gas Β· Coronado Ventures
785 MWWithdrawn / abandoned ERCOT Oct 2012target 2020
LaPaloma G
Gas Β· Coronado Ventures
730 MWWithdrawn / abandoned ERCOT May 2012target 2019
Indeck Wharton
Gas Β· Indeck
654 MWWithdrawn / abandoned ERCOT Nov 2012target 2021
SPC Henderson Option 2
Gas Β· Southern Power Company
478 MWWithdrawn / abandoned ERCOT Sep 2012target 2019
Guadalupe II
Gas Β· Calpine
362 MWWithdrawn / abandoned ERCOT Jun 2012target 2019
Panhandle Wind
Onshore wind Β· Pattern Panhandle Wind, LLC
322 MWWithdrawn / abandoned ERCOT Jul 2012target 2015
Route66 Wind
Onshore wind Β· Route 66 LLC
300 MWWithdrawn / abandoned ERCOT Jul 2012target 2015
Windwood Wind
Onshore wind Β· Lincoln Clean
300 MWWithdrawn / abandoned ERCOT Jun 2012target 2018
Panhandle Wind 3
Onshore wind Β· PATTERN PANHANDLE WIND 3 LLC
248 MWWithdrawn / abandoned Carson, TXERCOT Jul 2012target 2022
Smart Wind Ranch
Onshore wind Β· Spinning Star Energy LLC
230 MWWithdrawn / abandoned ERCOT Mar 2012target 2050
Tumbleweed Wind Farm
Onshore wind Β· Tumbleweed Wind Farm, LLC
201 MWWithdrawn / abandoned ERCOT Feb 2012target 2013
LHORN (Longhorn South W)
Onshore wind Β· EDF Renewables
160 MWWithdrawn / abandoned ERCOT Mar 2012target 2018
Freestone Chillers
Gas Β· Calpine
160 MWWithdrawn / abandoned ERCOT Nov 2012target 2016
Longhorn South
Onshore wind Β· EDF Renewable Energy
160 MWWithdrawn / abandoned ERCOT Mar 2012target 2020
Fluvanna Renewable 2
Onshore wind Β· Terna Energy
152 MWWithdrawn / abandoned ERCOT Jun 2012target 2018
RE Ft Stockton Solar
Solar Β· Recurrent Energy
140 MWWithdrawn / abandoned ERCOT Jan 2012target 2015
SSE phase 1
Onshore wind Β· Spinning Star Energy LLC
112 MWWithdrawn / abandoned ERCOT Dec 2012target 2013
Hidalgo Chillers
Gas Β· Calpine
95.0 MWWithdrawn / abandoned ERCOT Nov 2012target 2016
Magic Valley Chillers
Gas Β· Calpine
79.0 MWWithdrawn / abandoned ERCOT Nov 2012target 2016
TX_Marfa_Solar
Solar Β· Lincoln Renewable Energy, LLC
75.0 MWWithdrawn / abandoned ERCOT Oct 2012target 2015
Solar Prime TX-2
Solar Β· Solar Prime LLC
42.0 MWWithdrawn / abandoned ERCOT Jun 2012target 2014
Alpine 1 Solar
Solar Β· First Solar
30.0 MWWithdrawn / abandoned ERCOT Apr 2012target 2019
T2 EF Cogen (Silver Oak Processing)
Gas Β· T2 EF Cogeneration, LLC
25.0 MWWithdrawn / abandoned ERCOT May 2012target 2015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)