United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Brownsville G

Brownsville G is a 871 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2012 (completed)
  2. Withdrawn / abandonedAug 2018 (project stopped here)
  3. ConsentedJun 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0005
Grid region
ERCOT (Texas)
Developer
Tenaska
Connection point (POI)
Tap 345kV 5966 Palmito - 80137 Stewart
Technology
Gas: 871 MW
Total requested
871 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
12 July 2012
Agreement signed
15 June 2015
Proposed online date
December 2020
Withdrawn
August 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem