πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

SPC Henderson Option 2

SPC Henderson Option 2 is a 478 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
17INR0002
Grid region
ERCOT (Texas)
Developer
Southern Power Company
Connection point (POI)
tap both Trinidad (#3124) β€šΓ„Γ¬ Tricorn (#2432), 38.5 mi from Tricorn, and Trinidad (#3123) β€šΓ„Γ¬ Watmill (#2427), approx. 49.9 miles away from Watmill.
Technology
Gas: 478 MW
Total requested
478 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
4 September 2012
Proposed online date
June 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem