United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

Tumbleweed Wind Farm

Tumbleweed Wind Farm is a 201 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
12INR0088
Grid region
ERCOT (Texas)
Developer
Tumbleweed Wind Farm, LLC
Technology
Wind: 201 MW
Total requested
201 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
1 February 2012
Proposed online date
December 2013

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem