GAS Β· ERCOTLaPaloma G
LaPaloma G is a 730 MW gas request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2012 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedJun 2016 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 16INR0004
- Grid region
- ERCOT (Texas)
- Developer
- Coronado Ventures
- Connection point (POI)
- Potencia 345kV (8461)
- Technology
- Gas: 730 MW
- Total requested
- 730 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 21 May 2012
- Agreement signed
- 6 June 2016
- Proposed online date
- August 2019
Location
No county location in the queue data.