GAS Β· ERCOT

LaPaloma G

LaPaloma G is a 730 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJun 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0004
Grid region
ERCOT (Texas)
Developer
Coronado Ventures
Connection point (POI)
Potencia 345kV (8461)
Technology
Gas: 730 MW
Total requested
730 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
21 May 2012
Agreement signed
6 June 2016
Proposed online date
August 2019

Location

No county location in the queue data.