United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Pinecrest G

Pinecrest G is a 785 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2012 (completed)
  2. Withdrawn / abandonedSep 2018 (project stopped here)
  3. ConsentedFeb 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0006
Grid region
ERCOT (Texas)
Developer
Coronado Ventures
Connection point (POI)
3117 Lufkin 345kV
Technology
Gas: 785 MW
Total requested
785 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
5 October 2012
Agreement signed
9 February 2015
Proposed online date
April 2020
Withdrawn
September 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem