United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in Texas — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Endurance Park Storage Other · KCE TX 13, LLC |
51.5 MW | |
| River Valley Storage 2 Other · KCE TX 21, LLC |
51.5 MW | |
| River Valley Storage 1 Other · KCE TX 19, LLC |
51.5 MW | |
| High Lonesome BESS Other · High Lonesome Storage, LLC |
51.1 MW | |
| Padua Grid BESS Battery storage · Padua Grid, LLC |
51.1 MW | |
| Queen BESS Other · Roadrunner Storage, LLC |
51.1 MW | |
| Hidalgo II Wind Onshore wind · EDP Renewables |
51.0 MW | |
| RABBS U2 Power Station Gas |
51.0 MW | |
| Gas project J486, Grimes County Gas |
51.0 MW | |
| RABBS U1 Power Station Gas · Braes Bayou II, LLC |
51.0 MW | |
| RABBS U6 Power Station Gas |
51.0 MW | |
| Gransolar Texas One Solar · Gransolar Texas One, LLC |
50.8 MW | |
| Byrd Ranch Energy Storage Plant Other · Byrd Ranch Storage LLC |
50.6 MW | |
| High Lonesome Wind Phase II Onshore wind · HIGH LONESOME WIND POWER, LLC |
50.6 MW | |
| Tortolas BESS Other · BRP Tortolas BESS LLC |
50.3 MW | |
| Teco GTG2 Gas · Thermal Energy Corp. |
50.0 MW | |
| Roughneck Storage Other · KCE TX 23, LLC |
50.0 MW | |
| Brightside Solar Solar · Brightside Solar, LLC |
50.0 MW | |
| Lamesa Solar B (Phase II) IVORY Solar · OCI Solar |
50.0 MW | |
| Pitts Dudik Solar Solar · Elawan Pitts Dudik Solar, LLC |
49.6 MW | |
| Vancourt Solar Solar · Rayos Del Sol Solar Project, LLC |
45.7 MW | |
| Colorado Bend 2 repower Gas |
45.0 MW | |
| Oak Grove Units 1 & 2 repower Coal |
45.0 MW | |
| Wolf Hollow 2 repower Gas |
44.0 MW | |
| Zier Storage Other · Zier Solar, LLC |
40.4 MW | |
| Eunice Storage Other · 2W Permian Solar LLC |
40.3 MW | |
| Jungmann Solar Solar · BT Jungmann LLC |
40.2 MW | |
| Vera Wind V110 Onshore wind · Longroad Energy |
34.0 MW | |
| S_Hills Wind Onshore wind · SEYMOUR HILLS WIND PROJECT, LLC |
30.2 MW | |
| Pyron BESS II Other · Pyron Wind Farm, LLC |
30.2 MW | |
| BlueBell Solar Solar · Nextera |
30.0 MW | |
| RE Maplewood 2b Solar Solar · Recurrent Energy |
28.0 MW | |
| Espiritu Wind Onshore wind · Acciona |
25.2 MW | |
| SP TX-12B BESS Other · VESI Upton County BESS, LLC |
25.1 MW | |
| Bastrop Energy Center AGP repower Phase II Gas |
21.0 MW | |
| Bastrop Energy Center AGP repower Phase I Gas |
21.0 MW | |
| Onshore wind project GEN-2006-020S, Hansford County Onshore wind |
20.0 MW | |
| Pyron Wind Repower Onshore wind |
19.9 MW | |
| Anchor Wind IV Onshore wind |
19.3 MW | |
| Rio Nogales Agp Upgrade CT1 Gas · CPS Energy |
19.0 MW | |
| Rio Nogales Agp Upgrade CT3 Gas · CPS Energy |
19.0 MW | |
| Cameron Storage Other · Cameron Wind 1, LLC |
18.0 MW | |
| Gas project GEN-2016-177, Gaines County Gas |
17.0 MW | |
| Oxy Solar Solar · Oxy Renewable Energy |
16.2 MW | |
| Panther Creek III Repower Onshore wind |
16.0 MW | |
| STP Unit 1 repower Nuclear |
13.0 MW | |
| Inertia BESS Other · Inertia Energy Storage, LLC |
13.0 MW | |
| RIO NOGALES UPGRADE CT2 repower Gas |
13.0 MW | |
| Nasa Gas · NASA |
12.0 MW | |
| Bobcat Bluff repower Onshore wind |
12.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)397 · 53.8 GW
- SPP (Southwest Power Pool)30 · 4,859 MW
- MISO (Midcontinent)3 · 1,246 MW
- West (non-ISO utilities)1 · 420 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)