SOLAR Β· ERCOTOxy Solar
Oxy Solar is a 16.2 MW solar request built and operating in the ERCOT interconnection queue, in Ector County, Texas.
Request details
- Queue ID
- 19INR0184
- Grid region
- ERCOT (Texas)
- Developer
- Oxy Renewable Energy
- Connection point (POI)
- 11256 Goldsmith 138kV
- Location
- Ector County, Texas
- Technology
- Solar: 16.2 MW
- Total requested
- 16.2 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 17 July 2018
- Agreement signed
- 30 January 2019
- Proposed online date
- January 2021
- Came online
- February 2021
Location
Marker shows the centre of Ector County; the queue data does not give exact sites.
Other requests in Ector County
- Greyhound SolarSolar Β· 336 MW Β· agreement signed
- Sisters SolarSolar + storage Β· 302 MW Β· agreement signed
- Greyhound Solar - Phase ESolar Β· 151 MW Β· agreement signed
- Greyhound Solar - Phase FSolar Β· 102 MW Β· agreement signed
- Apple BESSBattery storage Β· 9.9 MW Β· agreement signed
- Gypsum Plains SolarSolar + storage Β· 503 MW Β· in study
- Velociraptor BESS IISolar + storage Β· 261 MW Β· in study
- Velociraptor BESS ISolar + storage Β· 261 MW Β· in study
- Van Zandt Energy StorageBattery storage Β· 257 MW Β· in study
- Velociraptor Solar IISolar + storage Β· 252 MW Β· in study
- Velociraptor Solar ISolar + storage Β· 252 MW Β· in study
- Gypsum Plains StorageSolar + storage Β· 211 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem