OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) (2023 requests) — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Blue Summit Energy Storage Wind + storage · NextEra Energy Interconnection Holdings, LLC |
100 MW | Agreement signed |
| IEP Blackhawk Battery storage · IEP Texas Verde II, llc |
100 MW | In study |
| Visol 1 Solar Solar · VISOL 1 SOLAR, LLC |
94.8 MW | In study |
| Trinity Hills BESS SLF Battery storage · Phoenix Battery Storage, LLC |
94.0 MW | In study |
| HappyDogSolar Solar + storage · Rosula Solar LLC |
85.5 MW | Agreement signed |
| RedSun BESS Solar + storage · Gransolar Texas Twenty Two |
84.0 MW | In study |
| FLIFER Solar I Solar · FLIFER LLC |
84.0 MW | In study |
| RedSun Solar Solar + storage · Gransolar Texas Twenty Two |
82.6 MW | Agreement signed |
| Proving Ground Solar Solar + storage · Lantana Solar LLC |
82.1 MW | In study |
| Stegall Solar Solar + storage · BT Martin Solar, LLC |
81.6 MW | In study |
| Flying Kite Solar Solar + storage · FLYING KITE SOLAR LLC |
80.4 MW | Agreement signed |
| Hinkell BESS Battery storage · Reveille BESS |
78.1 MW | In study |
| Sherbino II BESS SLF Battery storage · Phoenix Battery Storage, LLC |
77.4 MW | Agreement signed |
| Cairos Storage Solar + storage · Cairos Solar, LLC |
77.3 MW | In study |
| Dionysus Storage Solar + storage · Dionysus Solar, LLC |
77.3 MW | In study |
| Myers Storage Solar + storage · BT Myers Solar, LLC |
76.0 MW | In study |
| Proteus Vernon Solar SLF Solar + storage · Vernon Solar and Storage LLC (a Delaware LLC) |
75.0 MW | In study |
| French Riviera Storage Battery storage · Arana Creek Battery Storage LLC |
75.0 MW | In study |
| Valdivian Solar Solar · Abei Energy Green III LLC |
74.9 MW | In study |
| Pato Blanco Storage Battery storage · TX BESS 4, LLC |
71.3 MW | In study |
| Edens Solar Solar · Hill PV, LLC |
70.4 MW | In study |
| Indigo Storage 4 Solar + storage · Innovative Solar 245, LLC |
60.0 MW | In study |
| Indigo Storage 2 Solar + storage · Innovative Solar 245, LLC |
60.0 MW | In study |
| Indigo Storage 3 Solar + storage · Innovative Solar 245, LLC |
60.0 MW | In study |
| Sol Marina Energy Center BESS Solar + storage · Adapture Solar Development, LLC |
57.2 MW | Agreement signed |
| Orchard Ray BESS Battery storage · Pettus BESS |
51.9 MW | In study |
| Proving Ground BESS Solar + storage · Lantana Solar LLC |
51.4 MW | In study |
| Ayass BESS Battery storage · Harvick BESS, LLC |
51.3 MW | In study |
| Black Bear BESS Solar + storage · ESCONDIDO DRAW RESOURCES, LLC |
51.2 MW | In study |
| Lupinus Storage 3 Solar + storage · Lupinus Solar 2, LLC |
50.9 MW | Agreement signed |
| Stegall Storage Solar + storage · BT Martin Solar, LLC |
50.5 MW | In study |
| Surfside Energy Storage Battery storage · Rocky Mountain Energy Holdings, LLC |
50.3 MW | In study |
| Marick Rose BESS Battery storage · Marick BESS |
50.2 MW | In study |
| Fort Chadbourne Cattle BESS Battery storage · Fort Chadbourne BESS |
50.2 MW | In study |
| Beeman BESS Battery storage · Beeman BESS LLC |
50.2 MW | In study |
| Old Sorrell Energy Storage Battery storage |
43.1 MW | Paused / redesign |
| Pamplona Solar Solar + storage · Karol Solar III |
42.4 MW | In study |
| Weathervane Storage SLF Battery storage |
32.5 MW | Paused / redesign |
| Meridian BESS Battery storage · Navitas Energy- Meredian BESS |
31.2 MW | In study |
| NET Power Demonstration plant Gas · NET Power LLC |
25.5 MW | In study |
| CPS Energy AvR1CT2 Rotor Replacement Gas · CPS Energy |
23.2 MW | In study |
| Buzzi Maryneal Wind Project Onshore wind · Buzzi Unicem USA |
18.0 MW | In study |
| Texas Gulf Sulphur Repower Gas |
16.1 MW | Paused / redesign |
| Stephens Ranch Wind Repower Onshore wind · Stephens Ranch Wind Energy, LLC |
12.4 MW | In study |
| Clutch City Storage II SLF Battery storage |
11.3 MW | Paused / redesign |
| Panther Creek 1 Repower Onshore wind · Panther Creek Wind Farm I&II, LLC |
11.0 MW | In study |
| Damon BESS 2 Battery storage · PR DAMON, LLC |
10.0 MW | Agreement signed |
| Wildhorse POD Solar Solar · Highpeak Solar, LLC |
10.0 MW | Paused / redesign |
| Harris Spencer BESS Other · Harris Spencer BESS, LLC |
10.0 MW | Paused / redesign |
| Cedro Hill Wind Repower Onshore wind · CEDRO HILL WIND LLC |
9.9 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)309 · 110.9 GW
- ERCOT (Texas)356 · 76.0 GW
- CAISO (California)107 · 53.4 GW
- Southeast (non-ISO utilities)210 · 24.0 GW
- SPP (Southwest Power Pool)82 · 15.1 GW
- PJM (Mid-Atlantic, Midwest)156 · 14.6 GW
- MISO (Midcontinent)23 · 3,679 MW
- ISO-NE (New England)6 · 1,053 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)