🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in ERCOT (Texas) (2023 requests) — page 7

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown35676.0 GW
Active in queue76.0 GW356 requests
Agreement signed24.2 GW103 requests
Withdrawn8516.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

356 requests · page 7 of 8
ProjectCapacityStatusLocationRegionQueuedOnline
Blue Summit Energy Storage
Wind + storage · NextEra Energy Interconnection Holdings, LLC
100 MWAgreement signed Wilbarger, TXERCOT Oct 2023target 2026
IEP Blackhawk
Battery storage · IEP Texas Verde II, llc
100 MWIn study Galveston, TXERCOT Apr 2023target 2026
Visol 1 Solar
Solar · VISOL 1 SOLAR, LLC
94.8 MWIn study Val Verde, TXERCOT Oct 2023target 2028
Trinity Hills BESS SLF
Battery storage · Phoenix Battery Storage, LLC
94.0 MWIn study Archer, TXERCOT Nov 2023target 2027
HappyDogSolar
Solar + storage · Rosula Solar LLC
85.5 MWAgreement signed Milam, TXERCOT Jun 2023target 2027
RedSun BESS
Solar + storage · Gransolar Texas Twenty Two
84.0 MWIn study Burnet, TXERCOT Dec 2023target 2027
FLIFER Solar I
Solar · FLIFER LLC
84.0 MWIn study Ward, TXERCOT Mar 2023target 2027
RedSun Solar
Solar + storage · Gransolar Texas Twenty Two
82.6 MWAgreement signed Burnet, TXERCOT Dec 2023target 2027
Proving Ground Solar
Solar + storage · Lantana Solar LLC
82.1 MWIn study Schleicher, TXERCOT Jul 2023target 2028
Stegall Solar
Solar + storage · BT Martin Solar, LLC
81.6 MWIn study Robertson, TXERCOT Aug 2023target 2027
Flying Kite Solar
Solar + storage · FLYING KITE SOLAR LLC
80.4 MWAgreement signed Zavala, TXERCOT Apr 2023target 2027
Hinkell BESS
Battery storage · Reveille BESS
78.1 MWIn study La Salle, TXERCOT Aug 2023target 2027
Sherbino II BESS SLF
Battery storage · Phoenix Battery Storage, LLC
77.4 MWAgreement signed Pecos, TXERCOT Nov 2023target 2027
Cairos Storage
Solar + storage · Cairos Solar, LLC
77.3 MWIn study Kinney, TXERCOT Oct 2023target 2026
Dionysus Storage
Solar + storage · Dionysus Solar, LLC
77.3 MWIn study Houston, TXERCOT Jun 2023target 2027
Myers Storage
Solar + storage · BT Myers Solar, LLC
76.0 MWIn study Bee, TXERCOT Jun 2023target 2028
Proteus Vernon Solar SLF
Solar + storage · Vernon Solar and Storage LLC (a Delaware LLC)
75.0 MWIn study Wilbarger, TXERCOT Mar 2023target 2028
French Riviera Storage
Battery storage · Arana Creek Battery Storage LLC
75.0 MWIn study Kleberg, TXERCOT Feb 2023target 2028
Valdivian Solar
Solar · Abei Energy Green III LLC
74.9 MWIn study Hunt, TXERCOT Feb 2023target 2028
Pato Blanco Storage
Battery storage · TX BESS 4, LLC
71.3 MWIn study Fort Bend, TXERCOT May 2023target 2026
Edens Solar
Solar · Hill PV, LLC
70.4 MWIn study Hill, TXERCOT Oct 2023target 2027
Indigo Storage 4
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Oct 2023target 2026
Indigo Storage 2
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Sep 2023target 2026
Indigo Storage 3
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Nov 2023target 2026
Sol Marina Energy Center BESS
Solar + storage · Adapture Solar Development, LLC
57.2 MWAgreement signed Ellis, TXERCOT Oct 2023target 2027
Orchard Ray BESS
Battery storage · Pettus BESS
51.9 MWIn study Bee, TXERCOT Jun 2023target 2027
Proving Ground BESS
Solar + storage · Lantana Solar LLC
51.4 MWIn study Schleicher, TXERCOT Jul 2023target 2028
Ayass BESS
Battery storage · Harvick BESS, LLC
51.3 MWIn study Throckmorton, TXERCOT Dec 2023target 2028
Black Bear BESS
Solar + storage · ESCONDIDO DRAW RESOURCES, LLC
51.2 MWIn study Crockett, TXERCOT Dec 2023target 2028
Lupinus Storage 3
Solar + storage · Lupinus Solar 2, LLC
50.9 MWAgreement signed Franklin, TXERCOT Sep 2023target 2026
Stegall Storage
Solar + storage · BT Martin Solar, LLC
50.5 MWIn study Robertson, TXERCOT Aug 2023target 2027
Surfside Energy Storage
Battery storage · Rocky Mountain Energy Holdings, LLC
50.3 MWIn study Brazoria, TXERCOT Jul 2023target 2028
Marick Rose BESS
Battery storage · Marick BESS
50.2 MWIn study Fort Bend, TXERCOT Jul 2023target 2026
Fort Chadbourne Cattle BESS
Battery storage · Fort Chadbourne BESS
50.2 MWIn study Coke, TXERCOT Aug 2023target 2027
Beeman BESS
Battery storage · Beeman BESS LLC
50.2 MWIn study Gonzales, TXERCOT Apr 2023target 2027
Old Sorrell Energy Storage
Battery storage
43.1 MWPaused / redesign Concho, TXERCOT Jun 2023
Pamplona Solar
Solar + storage · Karol Solar III
42.4 MWIn study Austin, TXERCOT Aug 2023target 2028
Weathervane Storage SLF
Battery storage
32.5 MWPaused / redesign Montague, TXERCOT Aug 2023
Meridian BESS
Battery storage · Navitas Energy- Meredian BESS
31.2 MWIn study Bosque, TXERCOT Mar 2023target 2027
NET Power Demonstration plant
Gas · NET Power LLC
25.5 MWIn study Harris, TXERCOT Dec 2023target 2027
CPS Energy AvR1CT2 Rotor Replacement
Gas · CPS Energy
23.2 MWIn study Bexar, TXERCOT Oct 2023target 2025
Buzzi Maryneal Wind Project
Onshore wind · Buzzi Unicem USA
18.0 MWIn study Nolan, TXERCOT Oct 2023target 2026
Texas Gulf Sulphur Repower
Gas
16.1 MWPaused / redesign Wharton, TXERCOT Jul 2023
Stephens Ranch Wind Repower
Onshore wind · Stephens Ranch Wind Energy, LLC
12.4 MWIn study Borden, TXERCOT Jun 2023target 2027
Clutch City Storage II SLF
Battery storage
11.3 MWPaused / redesign Brazoria, TXERCOT Feb 2023
Panther Creek 1 Repower
Onshore wind · Panther Creek Wind Farm I&II, LLC
11.0 MWIn study Glasscock, TXERCOT Jun 2023target 2026
Damon BESS 2
Battery storage · PR DAMON, LLC
10.0 MWAgreement signed Brazoria, TXERCOT May 2023target 2026
Wildhorse POD Solar
Solar · Highpeak Solar, LLC
10.0 MWPaused / redesign Howard, TXERCOT Oct 2023target 2026
Harris Spencer BESS
Other · Harris Spencer BESS, LLC
10.0 MWPaused / redesign Harris, TXERCOT Mar 20232025
Cedro Hill Wind Repower
Onshore wind · CEDRO HILL WIND LLC
9.9 MWAgreement signed Webb, TXERCOT Sep 2023target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)