United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTHarris Spencer BESS
Harris Spencer BESS is a 10.0 MW other request suspended in the ERCOT interconnection queue, in Harris County, Texas.
Queue statusPaused / redesign
- PlanningQueued Mar 2023 (current stage)
- ConsentedOct 2023 (not yet reached)
- Construction (not yet reached)
- OperatingSep 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 24INR0545
- Grid region
- ERCOT (Texas)
- Developer
- Harris Spencer BESS, LLC
- Connection point (POI)
- Station Name: TSP STATION CODE = SP _x000D_ Load Transformer name = TR1 _x000D_ Bus#: PTI Bus number = 43271 _x000D_ Voltage: Transmission level kV = 138 KV_x000D_
- Location
- Harris County, Texas
- Technology
- Other: 10.0 MW
- Total requested
- 10.0 MW
- Study phase
- MRD Approved
- Queue status
- Suspended
- Entered queue
- 8 March 2023
- Agreement signed
- 31 October 2023
- Proposed online date
- October 2025
- Came online
- September 2025
Location
Marker shows the centre of Harris County; the queue data does not give exact sites.
Other requests in Harris County
- Elmax Power StationGas Β· 519 MW Β· agreement signed
- NRG THW GT 345 (Tef)Gas Β· 456 MW Β· agreement signed
- NRG Greens Bayou 6 (TEF-Due Diligence)Gas Β· 445 MW Β· agreement signed
- Rhapsody StorageBattery storage Β· 206 MW Β· agreement signed
- Callisto II Energy CenterBattery storage Β· 203 MW Β· agreement signed
- Brookview Road BESSBattery storage Β· 203 MW Β· agreement signed
- Houston IV BESSBattery storage Β· 165 MW Β· agreement signed
- Dori BQ BESSSolar + storage Β· 154 MW Β· agreement signed
- Friendswood Energy GencoGas Β· 144 MW Β· agreement signed
- Remy Jade III Power StationGas Β· 102 MW Β· agreement signed
- Pamela Heights IBattery storage Β· 102 MW Β· agreement signed
- Megamouth Energy StorageBattery storage Β· 101 MW Β· agreement signed
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem