United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTWildhorse POD Solar
Wildhorse POD Solar is a 10.0 MW solar request suspended in the ERCOT interconnection queue, in Howard County, Texas.
Queue statusPaused / redesign
- PlanningQueued Oct 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Feb 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 23INR0537
- Grid region
- ERCOT (Texas)
- Developer
- Highpeak Solar, LLC
- Connection point (POI)
- TDSP Station Code: WHPOD_x000D_ PTI BUS #: 1397_x000D_ Load/Load TR: LDWHPOD_x000D_ Voltage Level (Transmission): 138kV
- Location
- Howard County, Texas
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Study phase
- No MRD
- Queue status
- Suspended
- Entered queue
- 2 October 2023
- Proposed online date
- February 2026
Location
Marker shows the centre of Howard County; the queue data does not give exact sites.
Other requests in Howard County
- Ariji BESSBattery storage Β· 100 MW Β· agreement signed
- Infinium SolarSolar Β· 402 MW Β· in study
- Crater BESSBattery storage Β· 302 MW Β· in study
- Bhalu StorageBattery storage Β· 206 MW Β· in study
- Les Energy StorageBattery storage Β· 205 MW Β· in study
- Carolina Storage MidlandBattery storage Β· 205 MW Β· in study
- Prospector Energy StorageBattery storage Β· 205 MW Β· in study
- Carolina Storage OdessaBattery storage Β· 203 MW Β· in study
- Rattlesnake Gap Wind SLFOnshore wind Β· 200 MW Β· in study
- Prairie Blossom StorageBattery storage Β· 123 MW Β· in study
- Luthor SolarSolar Β· 101 MW Β· in study
- Calf Creek StorageBattery storage Β· 101 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem